FIR14-00792
| INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 3:47:24 PM | P | PART |
|
|
RTC inspection for Bldg H wet system for first and second floors - hard lid areas - see plans for areas inspected. Also Bldg H first floor feed main provides protection for the bulk feed main that supplies wings A-D, that are completed and in service.
|
FIR14-00071
| INSP-Sprinkler Rough-in/Hydro | 6/26/2015 | 6/26/2015 | 6/26/2015 3:43:43 PM | P | PASS |
|
|
Bldg L dry pipe system hydrotest (200 psi @ 2 hours) - PASSED
|
FIR15-00096
| INSP-Sprinkler Rough-in/Hydro | 6/25/2015 | 6/26/2015 | 6/26/2015 3:41:48 PM | A | PART |
|
|
RTC inspection for dry and wet pipe system supplying the noth side of floor #5. Both passed inspection, while some repair work was needed for several draft stops, that were repaired before the end of the inspection. OK to cover for these two systems. Also tenting (insulation) inspection of units 509, 510, 512, 513, 514, 515, 516, 517 and 518.
|
FIR14-00687
| INSP-Sprinkler Rough-in | 6/25/2015 | 6/26/2015 | 6/26/2015 3:37:48 PM | A | CANC |
|
|
Wrong permit for this day's inspection. See FIR14-00096 for inspections completed today (6/26).
|