Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02632 FIRE-Conference6/25/20156/26/20156/29/2015 10:44:27 AMADONE
Questioned regarding the location of a fire extinguisher for the outside fire pit, surveyed and verified an acceptable location.
BLD15-01971 FIRE-Final Inspection6/26/20156/26/20156/26/2015 4:05:50 PMPPASS
Life fire safety passed/complete
FIR15-00358 INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015 3:01:06 PMPPASS
Inspection was for a rough-in/hydro, not rough in only. 1st floor, 2nd floor and FDC hydrostatic test passed/complete
FIR15-00417 INSP-Final Inspection6/26/20156/26/20156/26/2015 2:42:45 PMPPASS
Fire sprinkler inspection passed/complete
FIR14-00799 INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015 2:36:42 PMPPART
Contractor re-configured head placement in growth chambers,east side of building first floor, instead of 4 pendants contractor changed to two sidewalls, coverage works with application. Contractor will notate on as-build drawings the change in head lauout.
FIR15-00176 INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015 2:07:25 PMPPART
Notated in red ink on city approved plans areas inspected and approved for cover
FIR14-00879 INSP-Sprinkler Rough-in6/26/20156/26/20156/26/2015 2:05:35 PMPPART
Notated in red ink on city approved plans areas inspected and approved for cover
FIR15-00078 INSP-Alarm Testing6/25/20156/26/20156/26/2015 12:53:24 PMAFAIL
Dry system trip test failed, time for water discharge at inspectors test 70 seconds.
BLD14-00586 FIRE-Final Inspection6/26/20156/26/20156/26/2015 12:25:58 PMPPASS
Life fire safety passed/complete
FIR15-00260 INSP-Sprinkler Rough-in6/25/20156/26/20156/26/2015 12:05:32 PMAPASS
2nd floor rough-in inspection passed/complete, approved for cover
FIR15-00078 INSP-Sprinkler Rough-in6/25/20156/26/20156/26/2015 11:08:12 AMAPASS
Dry system hydrostatic test passed/complete
BLD15-01662 FIRE-Final Inspection6/25/20156/26/20156/26/2015 10:29:09 AMAPASS
Life fire safety passed/complete
FIR14-00771 INSP-Sprinkler Rough-in/Hydro6/26/20156/26/20156/26/2015 9:57:23 AMAPASS
Overhead fire sprinkler piping/tenting approved for cover
FIR15-00315 INSP-Final Inspection6/25/20156/26/20156/26/2015 9:38:37 AMAPASS
Fire sprinkler inspection passed/complete
FIR15-00177 INSP-Supply line flush6/25/20156/26/20156/26/2015 9:18:48 AMADONE
Supply line flush complete
FIR15-00208 INSP-Sprinkler Rough-in6/25/20156/26/20156/26/2015 8:44:12 AMAPART
Front entry inspected, notated in red on city approved drawings area approved for cover
FIR11-00096 INSP-Final Inspection6/24/20156/26/20156/26/2015 8:15:01 AMAPASS
Pre-action system tested, isolated low air alarm, no solenoid activation, isolated one smoke, no solenoid activated, activated low air with smoke, solenoid activated and tripped pre-action valve. Also tested alarm pressue switch as well as both tamper switches associated with this pre-action system.