BLD14-02632
| FIRE-Conference | 6/25/2015 | 6/26/2015 | 6/29/2015 10:44:27 AM | A | DONE |
|
|
Questioned regarding the location of a fire extinguisher for the outside fire pit, surveyed and verified an acceptable location.
|
BLD15-01971
| FIRE-Final Inspection | 6/26/2015 | 6/26/2015 | 6/26/2015 4:05:50 PM | P | PASS |
|
|
Life fire safety passed/complete
|
FIR15-00358
| INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 3:01:06 PM | P | PASS |
|
|
Inspection was for a rough-in/hydro, not rough in only. 1st floor, 2nd floor and FDC hydrostatic test passed/complete
|
FIR15-00417
| INSP-Final Inspection | 6/26/2015 | 6/26/2015 | 6/26/2015 2:42:45 PM | P | PASS |
|
|
Fire sprinkler inspection passed/complete
|
FIR14-00799
| INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 2:36:42 PM | P | PART |
|
|
Contractor re-configured head placement in growth chambers,east side of building first floor, instead of 4 pendants contractor changed to two sidewalls, coverage works with application. Contractor will notate on as-build drawings the change in head lauout.
|
FIR15-00176
| INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 2:07:25 PM | P | PART |
|
|
Notated in red ink on city approved plans areas inspected and approved for cover
|
FIR14-00879
| INSP-Sprinkler Rough-in | 6/26/2015 | 6/26/2015 | 6/26/2015 2:05:35 PM | P | PART |
|
|
Notated in red ink on city approved plans areas inspected and approved for cover
|
FIR15-00078
| INSP-Alarm Testing | 6/25/2015 | 6/26/2015 | 6/26/2015 12:53:24 PM | A | FAIL |
|
|
Dry system trip test failed, time for water discharge at inspectors test 70 seconds.
|
BLD14-00586
| FIRE-Final Inspection | 6/26/2015 | 6/26/2015 | 6/26/2015 12:25:58 PM | P | PASS |
|
|
Life fire safety passed/complete
|
FIR15-00260
| INSP-Sprinkler Rough-in | 6/25/2015 | 6/26/2015 | 6/26/2015 12:05:32 PM | A | PASS |
|
|
2nd floor rough-in inspection passed/complete, approved for cover
|
FIR15-00078
| INSP-Sprinkler Rough-in | 6/25/2015 | 6/26/2015 | 6/26/2015 11:08:12 AM | A | PASS |
|
|
Dry system hydrostatic test passed/complete
|
BLD15-01662
| FIRE-Final Inspection | 6/25/2015 | 6/26/2015 | 6/26/2015 10:29:09 AM | A | PASS |
|
|
Life fire safety passed/complete
|
FIR14-00771
| INSP-Sprinkler Rough-in/Hydro | 6/26/2015 | 6/26/2015 | 6/26/2015 9:57:23 AM | A | PASS |
|
|
Overhead fire sprinkler piping/tenting approved for cover
|
FIR15-00315
| INSP-Final Inspection | 6/25/2015 | 6/26/2015 | 6/26/2015 9:38:37 AM | A | PASS |
|
|
Fire sprinkler inspection passed/complete
|
FIR15-00177
| INSP-Supply line flush | 6/25/2015 | 6/26/2015 | 6/26/2015 9:18:48 AM | A | DONE |
|
|
Supply line flush complete
|
FIR15-00208
| INSP-Sprinkler Rough-in | 6/25/2015 | 6/26/2015 | 6/26/2015 8:44:12 AM | A | PART |
|
|
Front entry inspected, notated in red on city approved drawings area approved for cover
|
FIR11-00096
| INSP-Final Inspection | 6/24/2015 | 6/26/2015 | 6/26/2015 8:15:01 AM | A | PASS |
|
|
Pre-action system tested, isolated low air alarm, no solenoid activation, isolated one smoke, no solenoid activated, activated low air with smoke, solenoid activated and tripped pre-action valve. Also tested alarm pressue switch as well as both tamper switches associated with this pre-action system.
|