ELE18-02181
| Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 2:38:54 PM | P | PASS |
|
|
Uffer Ground Phone #: ###-#### Inspection requested via web by Bryan Atkins...ok to cover
|
ELE18-01854
| Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 2:25:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins...walls and hard lid ok to cover
|
ELE18-02357
| Permanent Service | 6/26/2018 | 6/26/2018 | 6/26/2018 2:19:23 PM | P | PASS |
|
|
reenergize...p/s o/h reconnect ok
will verify grounding of water pipe at time of final..given wrong size wire at store...no eddison circuits...verify labelling at final
|
ELE18-02390
| Electrical Rough-In | 6/26/2018 | 6/26/2018 | 6/26/2018 1:05:55 PM | P | PASS |
|
|
underground rough in for bollard lights along walkway running East to West along North side of apartment complex site. See Ryan Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
|
ELE18-02339
| Conference | 6/25/2018 | 6/26/2018 | 6/26/2018 11:32:04 AM | A | PASS |
|
|
Call half hour before to meet // Alek Phone #: ###-####...discussed wiring of addition...new service location..power requirement for new addition and existing house...one service drop only...pamphlet given on wiring new addition...homeowner competent to do work
|
ELE18-02222
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:20:19 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen....Boise City requirement that rough inspection be performed before a final can be scheduled...contractor must be onsite to remove panels and verify UL listing of equipment and proper grounding before a final will be given
|
ELE18-00715
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:13:41 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...switch in kitchen needs installed completely...plate and recessed flush
|
ELE18-00716
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:12:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE18-00759
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:12:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall....ok to final
|
ELE18-00840
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:11:28 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...boxes shall be flush with wall or tile...outlet needs installed completely...kitchen outlet no tile
|
ELE17-04126
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 10:10:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE12-01841
| ELE-Aging Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 8:29:00 AM | | CANC |
|
|
DOC expired
|
ELE18-00834
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 8:24:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...corrections made..ok to final
|
ELE18-00529
| Final | 6/25/2018 | 6/26/2018 | 6/26/2018 8:16:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...corrections made...ok to final
|