FIR18-00094
| INSP-Final Inspection | 6/25/2018 | 6/26/2018 | 6/26/2018 3:34:00 PM | A | FAIL |
|
|
Need Lee to approve as-builts when received.
Rand Phone #: ###-####
|
BLD18-00955
| FIRE-Conference | 6/26/2018 | 6/26/2018 | 6/26/2018 2:59:08 PM | P | DONE |
|
|
I spoke with the project superintendant about the drawing sheet E4 that shows a fire alarm notification device and a manual pull station.
|
BLD17-02479
| FIRE-Final Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 1:55:16 PM | P | PASS |
|
|
Life safety passed. I let Pat know that the Grading Permit has not been signed off yet.
Pat Phone #: ###-####
|
BLD17-00022
| FIRE-Final Inspection | 6/26/2018 | 6/26/2018 | 6/26/2018 1:52:43 PM | P | FAIL |
|
|
See the city approved fire life safety notes for items that need corrected which include signage, repair one exit sign, final on fire alarm permit, painting on curbing...ect.
Tyler Phone #: ###-####
|
FIR18-00442
| INSP-Sprinkler Rough-in | 6/26/2018 | 6/26/2018 | 6/26/2018 1:19:56 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
Adam Phone #: ###-####
|
FIR18-00448
| INSP-Sprinkler Rough-in/Hydro | 6/25/2018 | 6/26/2018 | 6/26/2018 11:54:29 AM | A | PART |
|
|
The rough-in for the mains and branchlines passed. Missing one earthquake brace at the drop down to the clean room. Need as-builts due to two addtional 90's in the 4" feed main just outside of the riser room. Will need another rough to cover inspection when the flex heads are installed. Not able to do the hydro test due to fhe flex heads not being installed.
Call Anthony to coordinate, thanks Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR17-00412
| INSP-Sprinkler Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 10:21:04 AM | A | PART |
|
|
Rough-in passed/piping can be covered. See the city approved plans for locations where several uprights need to be added and a large corridoe that the three pendant heads are overs paced
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00057
| INSP-Sprinkler Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 10:18:45 AM | A | PART |
|
|
Pendant heads exceed 7' from wall in acouple locations. Final locations of these heads can be verified at final. Piping is ok for cover/rough-in passed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR17-00522
| INSP-Final Inspection | 6/25/2018 | 6/26/2018 | 6/26/2018 10:16:26 AM | A | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
NAF16-00069
| INSP-Sprinkler Rough-in/Hydro | 6/25/2018 | 6/26/2018 | 6/25/2018 12:00:00 AM | A | CANC |
|
|
There is no fire sprinkler system in the single family dwelling. Call prior to going >> Inspection requested via mobile web by Parkway
|
NAF16-00069
| INSP-Final | 6/25/2018 | 6/26/2018 | 6/25/2018 12:00:00 AM | A | PASS |
|
|
Verified that addess has been up dated with the fire department. Ron Johnson verified that he has recieved the update. 6-25-18**ajs**>> Inspection requested via mobile web by Parkway
|