ELE19-02348
| Electrical Rough-In | 6/26/2019 | 6/26/2019 | 6/26/2019 2:30:12 PM | P | PASS |
|
|
Uffer inspection Phone #: ###-#### Inspection requested via web by Tom Jenkins... bare copper...ok to cover
|
ELE19-02296
| Permanent Service | 6/20/2019 | 6/26/2019 | 6/26/2019 2:12:12 PM | P | PASS |
|
|
Please perform in the later afternoon and call Juan at ###-#### when on the way. Thank you! Phone #: ###-#### Inspection requested via web by William Salts... p/s o/h reconnect ok
|
ELE19-02377
| Rough-In Permanent Service | 6/25/2019 | 6/26/2019 | 6/26/2019 1:38:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cal crosby... rough in ok to cover p/s u/g new ok
|
ELE19-02253
| Electrical Rough-In | 6/26/2019 | 6/26/2019 | 6/26/2019 12:54:38 PM | P | PASS |
|
|
listing inspection for solar equipment Phone #: ###-#### Inspection requested via web by Ryan King... UL listed equipment verified...will need access for final...electrical equip backyard
|
ELE19-02388
| Final | 6/26/2019 | 6/26/2019 | 6/26/2019 12:37:49 PM | P | PASS |
|
|
Robert Phone #: ###-####... circuit fed off existing pedestal...OCPD and service outlet ok...complete...ok to final
|
ELE19-02355
| Final | 6/26/2019 | 6/26/2019 | 6/26/2019 11:32:13 AM | A | PASS |
|
|
please call half hour before so I can meet you there. Thanks Phone #: ###-#### Inspection requested via web by mark hood.. pool complete, GFCI protection verified...pool operation at time of inspection...ok to final
|
ELE19-02355
| Electrical Rough-In | 6/24/2019 | 6/26/2019 | 6/26/2019 11:30:58 AM | A | PASS |
|
|
please call half hour before so I can meet you there. Thanks Phone #: ###-#### Inspection requested via web by mark hood... bonding complete, four corners and water bond coupling, pump bond...no diving board or handrails
|
ELE19-00143
| Final | 6/25/2019 | 6/26/2019 | 6/26/2019 11:05:13 AM | A | PASS |
|
|
Requesting final electrical inspection. Requesting final building inspection for same day. Phone #: ###-#### Inspection requested via web by Lee Long..ok to final
|
ELE19-02160
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 10:13:28 AM | A | PASS |
|
|
Please call the number above before heading to the jobsite. Thanks ! Phone #: ###-#### Inspection requested via web by BRS Permitting.. UL listed equipment verified will need access to panel at final
|
ELE19-01351
| Final | 6/26/2019 | 6/26/2019 | 6/26/2019 9:56:02 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by steve sellers... 1) all openings in panel shall be closed 2) all outlets within 6ft of sink/water need GFCI protection...washing stations 3)switch for light and outlet at furnace in attic need added at attic access
|
ELE19-02102
| Final | 6/25/2019 | 6/26/2019 | 6/26/2019 9:20:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen... labelling, disconnect, and OCPD ok
|
ELE19-02375
| Electrical Rough-In | 6/25/2019 | 6/26/2019 | 6/26/2019 8:59:06 AM | A | PASS |
|
|
Please call the GC (Luke Gilbert) in advance at 2083041227 for access to the house. Phone #: ###-#### Inspection requested via web by Dan Hilke... rough ok to cover new outlet above liv fireplace, new bathroom, and new laundry location downstairs
|
ELE19-02370
| Temporary Service | 6/25/2019 | 6/26/2019 | 6/26/2019 8:23:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson...t/s u/g n ok
|