BLD18-02896
| BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 7/1/2019 8:01:33 AM | | PASS |
|
|
Expires: 08/10/19
|
BLD18-02126
| BLD-Other | 6/26/2019 | 6/26/2019 | 6/26/2019 3:48:08 PM | P | PASS |
|
|
check fire separation 1 hr wall.....//ok per appoved plans//ok to continue//
|
BLD18-02126
| BLD-Framing/Rough-in | 6/26/2019 | 6/26/2019 | 6/26/2019 3:46:30 PM | P | CANC |
|
|
Neal Phone #: ###-####
|
BLD19-01655
| BLD-Foundation | 6/26/2019 | 6/26/2019 | 6/26/2019 3:31:48 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron//foundation ok per plans//
|
BLD19-02054
| BLD-Framing/Rough-in | 6/26/2019 | 6/26/2019 | 6/26/2019 2:15:24 PM | P | PASS |
|
|
Call ahead // Eric Phone #: ###-####//framing ok per plans// insulation ok in exterior wall// ok to cover//
|
BLD19-02253
| BLD-Final | 6/25/2019 | 6/26/2019 | 6/26/2019 1:46:49 PM | P | PASS |
|
|
Brian Phone #: ###-####-please call for access code//bathroom door hardware changed per fire comments//final is complete per approved plans// no work other than cosmetic was done.
|
MIS19-00176
| BLD-Conference | 6/24/2019 | 6/26/2019 | 6/26/2019 1:20:08 PM | A | DONE |
|
|
Check for construction activity..........//tarp was removed//no construction activity witnessed onsite//
|
BLD18-03121
| BLD-Other | 6/26/2019 | 6/26/2019 | 6/26/2019 12:55:52 PM | A | CANC |
|
|
follow up on hold down installation........
|
BLD18-03121
| BLD-Framing/Rough-in | 6/26/2019 | 6/26/2019 | 6/26/2019 12:53:51 PM | P | PART |
|
|
Bill Phone #: ###-####//framing corrections made//waiting for hold down extensions//will schedule follow up mid am 6/27//install trimmers on header second floor//ok to insulate top down//units 5's and 6's
|
BLD19-00136
| BLD-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 11:27:37 AM | A | PASS |
|
|
Requesting final inspection for building permit. Scheduling final electrical inspection on same day. Phone #: ###-#### Inspection requested via web by Lee Long//final complete//
|
BLD19-00136
| DOC - Permit Finaled | 6/26/2019 | 6/26/2019 | 6/26/2019 11:27:14 AM | P | PASS |
|
|
|
BLD18-02334
| BLD-Final | 6/24/2019 | 6/26/2019 | 6/26/2019 10:34:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith//new roof flashings installed//roof appears to be within code requirements//
|
BLD19-01077
| BLD-Ceiling Grid Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 10:12:10 AM | A | PART |
|
|
Please call 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries//grid ok//need to get mechanical completed and inspected//do not cover until HVAC is passed//divider wall framing ok per engineering.//
|
BLD19-01311
| BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 9:36:24 AM | A | NR |
|
|
TODD Phone #: ###-####//fire sprinkler inspection did not pass//call ro re-inspction once fire has signed off//
|
BLD19-01016
| BLD-Wall Bracing | 6/25/2019 | 6/26/2019 | 6/26/2019 9:10:37 AM | A | PART |
|
|
shear // Dean Phone #: ###-####//nailing ok//add blocks at shear panels and nail edges//will check at framing//
|
BLD18-02336
| BLD-Other | 6/24/2019 | 6/26/2019 | 6/26/2019 8:39:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith//roof appears to be installed within code requirements//new roof flashings and shingles installed. one layer//
|
BLD18-02336
| DOC - Permit Finaled | 6/26/2019 | 6/26/2019 | 6/26/2019 8:38:28 AM | P | PASS |
|
|
|
MIS19-00178
| BLD-Conference | 6/24/2019 | 6/26/2019 | 6/26/2019 8:15:18 AM | A | DONE |
|
|
Check for permits...correction notice issued on 6/24/2019//permit was issued//
|
BLD18-01515
| BLD-Aging Inspection | 6/26/2019 | 6/26/2019 | 6/26/2019 8:00:09 AM | | DONE |
|
|
final passed//see below// BLD-Final 2/11/2019 2/11/2019 2/12/2019 P PASS DetailsJim Sly
|