BLD19-00363
| FIRE-Final Inspection | 6/26/2020 | 6/26/2020 | 6/26/2020 3:37:03 PM | P | FAIL |
|
|
Inspection was actually for a conferene to go over life safety items. I agreed a fire lane sign could be mounted on the wall at the property entrance. I pointed out the requirement for panic hardware in the path of egress from the Break Room. Break Room would also need Occupant Load sign, need Fire Dept radio verified per notes, need signage on Riser Room and Electrical Rooms doors....ect.
Herb *screened* Phone #: ###-####
|
FIR20-00410
| INSP-Final Inspection | 6/25/2020 | 6/26/2020 | 6/26/2020 3:34:09 PM | P | FAIL |
|
|
No testing performed due to no access to the Riser Room because of a freshly poured concrete pad.
The tech you will be meeting is Jason Petty. Please call 15-20 Minutes prior to arrival. Phone #: ###-#### Inspection requested via web by jason petty
|
FIR19-00516
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 3:33:14 PM | A | PASS |
|
|
Piping in the 7th floor resident rooms, that is above the soffits, is ok for cover. Also one pendant in the soffit in the west side common corridor. Tony adjusted some of the hangers while I was there.
Tony Cetani is the contact and this inspection will be for the 7th floor. Thanks so much!! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-00565
| FIRE-Final Inspection | 6/24/2020 | 6/26/2020 | 6/26/2020 12:08:01 PM | A | FAIL |
|
|
Provide plan mods showing the actual new door locations and actual door swing direction, provide sprinkler and fire alarm modifications (permits) for the required changes due to the new wall installations.
screened // Dustin Phone #: ###-####
|
FIR20-00428
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 11:41:56 AM | A | PASS |
|
|
See city approved plans for two locations where the sprinkler piping is ok to cover above the hard lids.
Please contact Adam for inspection time. This inspection for 2 sprinkler heads in hard lids. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR20-00313
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 10:55:37 AM | A | PASS |
|
|
The two apartments, third floor, east side of breeze way, tenting is passed. Piping can be covered.
Matt ..... screened Phone #: ###-####
|
FIR20-00416
| INSP-Final Inspection | 6/23/2020 | 6/26/2020 | 6/26/2020 10:30:01 AM | A | PASS |
|
|
Permit finaled. Inspection performed by Greg.
Screened- Nate Phone #: ###-####
|
FIR19-00789
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 9:51:16 AM | A | PASS |
|
|
The underground supply line rough-in passed. Piping is ok for cover.
screened // Mike Phone #: ###-####
|
FIR20-00142
| INSP-Final Inspection | 6/24/2020 | 6/26/2020 | 6/26/2020 8:42:45 AM | A | PASS |
|
|
Permit finaled. Inspection performed by Greg. Kc Strykowski, Tech Phone #: ###-#### Inspection requested via web by John Siewert
|
FIR20-00449
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 8:07:47 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR20-00450
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 8:06:50 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR20-00448
| INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 8:05:58 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Please contact Terry Nelson for inspection time. We have 3 different permits scheduled for inspections at Pinnacle Square. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|