Inspections for the day of: Friday, June 26, 2020.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00323 BLD-Aging Inspection6/26/20206/26/20206/30/2020 7:15:47 AM PEND
MIS18-00110 MIS-Aging Inspection6/26/20206/26/20206/30/2020 7:14:09 AM PEND
permit is issued, no contact has been made for inspections
MIS19-00155 MIS-Aging Inspection6/26/20206/26/20206/30/2020 7:12:24 AM PEND
BLD19-02788 BLD-Aging Inspection6/26/20206/26/20206/30/2020 7:11:45 AM PEND
MIS19-00185 MIS-Aging Inspection6/26/20206/26/20206/30/2020 7:10:05 AM CANC
BLD20-00704 BLD-Framing/Rough-in6/25/20206/26/20206/26/2020 4:23:10 PMPCANC
Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD18-04581 BLD-Final6/25/20206/26/20206/26/2020 4:22:42 PMAPASS
David Phone #: ###-####//corrections made//final complete//
BLD18-04581 DOC - Permit Finaled6/26/20206/26/20206/26/2020 4:22:20 PMPPASS
BLD18-04581 BLD-Blower Door Test Results6/26/20206/26/20206/26/2020 4:22:10 PMPCANC
2.88 ACH 50
BLD20-01283 BLD-Wall Bracing6/25/20206/26/20206/26/2020 3:17:36 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add HD nails in pt//staples were peing added onsite as we walked shear//
BLD20-01286 BLD-Wall Bracing6/25/20206/26/20206/26/2020 3:17:18 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add HD nails in pt//staples were peing added onsite as we walked shear//
BLD20-01287 BLD-Wall Bracing6/25/20206/26/20206/26/2020 2:49:48 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add HD nails in pt//staples were peing added onsite as we walked shear//
BLD20-01289 BLD-Wall Bracing6/25/20206/26/20206/26/2020 2:49:32 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle//add HD nails in pt//staples were peing added onsite as we walked shear//
BLD19-04651 BLD-Conference6/26/20206/26/20206/26/2020 2:45:12 PMPDONE
Screened // Mark Phone #: ###-####
BLD19-00535 BLD-Energy code compliance6/26/20206/26/20206/26/2020 2:01:36 PMPPART
INsulation inspection for 1st and 2nd floor approval for cover Phone #: ###-#### Inspection requested via web by Travis Blackburn//framing corrections made//stuff insulation around vent pipes//
BLD20-02040 BLD-Final6/26/20206/26/20206/26/2020 1:30:32 PMPDONE
fixed areas of missing water kick flashing Phone #: ###-#### Inspection requested via web by Kenneth Clark
BLD20-02040 DOC - Permit Finaled6/26/20206/26/20206/26/2020 1:30:22 PMPPASS
final complete, kick out flashings added at front entry area,, other areas of roof had a type of flashing already installed//
BLD19-04013 BLD-Energy code compliance6/25/20206/26/20206/26/2020 11:28:45 AMACANC
Phone #: ###-#### Inspection requested via web by Matthew Bundy
BLD20-00344 BLD-Framing/Rough-in6/25/20206/26/20206/26/2020 11:27:39 AMAPART
screened // John Phone #: ###-####//areas marked on plans ok per plans and engineering clarification//some areas are pending ELE rough and were marked accordingly//
BLD20-01333 BLD-Foundation6/25/20206/26/20206/26/2020 10:48:43 AMAPART
The stem walls will be built first thing in the morning and should be available to be inspected by 8:30 or 9:00 am - Concrete is scheduled for Noon.

I am sorry the plans in the tube were not the city approved plans. I printed the wring file. They will be replaced as soon as i can get them re-printed. Thank you!
Call Matt - ###-####
or Jeff - ###-#### Phone #: ###-#### Inspection requested via web by Matthew Swenson//city approved plans not onsite// small garage, rebar added to front wall per previous inspector//need to get approved plans onsite//WIP//
BLD20-01418 BLD-Footing6/25/20206/26/20206/26/2020 10:36:15 AMAFAIL
screened // francies Phone #: ###-####//CN issued//need side and back property lines marked nad pins located//provide city approved plans for inspections//
BLD20-00337 BLD-Foundation6/25/20206/26/20206/26/2020 10:18:09 AMAPART
screened // Chase Phone #: ###-####//part of Area C foundation walls//ok pend specials//maintain bar clearances//
BLD20-01152 BLD-Framing/Rough-in6/25/20206/26/20206/26/2020 9:35:46 AMAPART
Truss plans onsite. Call Alex at ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Alex Macdonald//CN posted for bearing wall corrections at center truss bearing//need to install FP and have inspected//ok to insulate--DO NOT INSULATE AREA WHER FP IS UNTIL IT HAS BEEN INSPECTED//
BLD19-03050 BLD-Foundation6/25/20206/26/20206/26/2020 9:05:16 AMAPART
rebar // Dave ...... screened Phone #: ###-####//WIP//pend all special inspections//
BLD19-04398 BLD-Framing/Rough-in6/25/20206/26/20206/26/2020 8:49:26 AMAPASS
Please call before coming to make sure someone is home and give plenty of time to get home.
Thanks Phone #: ###-#### Inspection requested via web by Shane Taylor//framing corrections made//energy ok//
BLD20-00680 BLD-Wall Bracing6/25/20206/26/20206/25/2020 3:07:12 PMAPASS
Phone #: ###-#### Inspection requested via web by Kelly Stover//ok when stud added and blocking added as discussed//