BLD99-02447
| BLD-Conference | 6/26/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | A | N/A |
|
|
Kristen ###-#### purch list for final left on site 6/27/00 2:13:44 PM
|
BLD00-00842
| BLD-Framing/Rough-in | 6/26/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | A | PART |
|
|
###-#### shear nail ok to side 6/27/00 2:14:04 PM
|
BLD00-00790
| BLD-Framing/Rough-in | 6/26/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | A | PASS |
|
|
shear wall phil ###-#### ok to side only shear wall insp. 6/28/00 1:45:20 PM
|
BLD00-00537
| BLD-Final | 6/26/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | TEMP |
|
|
###-#### need to change 2 front windows-one for temp. glass one for venstolaton for plans- verify e/ oc. final 6/28/00 1:47:56 PM
|
BLD00-00396
| BLD-Final | 6/26/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 17:35:06. Contact: ###-####. temp occ signed w/ need of verification of fire -plumbing sign off 6/28/00 1:45:55 PM
|
BLD99-03671
| BLD-Framing/Rough-in | 6/27/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/27/2000 at 07:56:12. Contact: ###-####. c/n on site- roof demo load-hangers fire blocks 6/28/00 1:44:50 PM
|
BLD00-00727
| BLD-Final | 6/27/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | PASS |
|
|
C&C Salvage ###-#### appeared ok-clean- 6/28/00 1:46:17 PM
|
BLD98-01745
| BLD-Conference | 6/27/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | N/A |
|
|
Rainey Johnson ###-#### after 1 verbal to be in compliance for framing inspection 6/28/00 1:46:49 PM
|
BLD00-01846
| BLD-Footing | 6/27/2000 | 6/27/2000 | 6/27/2000 12:00:00 AM | P | PART |
|
|
Victor ###-####
|