ELE02-01871
| Final | 6/26/2002 | 6/27/2002 | 6/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 12:44:49. Contact: ###-####.
final/ok/sign 6/27/2002 10:45:39 AM
|
ELE02-00428
| Final | 6/26/2002 | 6/27/2002 | 6/27/2002 12:00:00 AM | A | NH |
|
|
call 1st before insp-re-insp - jim ###-####
called left message. 6/27/2002 11:15:49 AM
|
ELE02-01964
| Electrical Rough-In | 6/26/2002 | 6/27/2002 | 6/27/2002 12:00:00 AM | A | FAIL |
|
|
alan ###-####
correction ceiling box on porch needs to be flush.
called contractor,call for inspect. before installing fixture. 6/27/2002 11:14:40 AM
|
ELE02-01932
| Electrical Rough-In | 6/26/2002 | 6/27/2002 | 6/27/2002 12:00:00 AM | A | PASS |
|
|
JIM
reinspect.ok 6/27/2002 10:47:53 AM
|