ESC03-00551
| Site Preparation | 6/25/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | A | PASS |
|
|
|
ESC03-00359
| Site Preparation | 6/25/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | A | PASS |
|
|
|
ESC03-00603
| Site Preparation | 6/25/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | A | FAIL |
|
|
Port-A-Pot still on sidewalk, called rp-Jeff- Move by end of week or a stop work order will be issued. 6/27/2003 2:35:31 PM
|
ESC03-00206
| Site Preparation | 6/25/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | A | PART |
|
|
Left message for M. Brown-rp- Need to have a conference to review his esc plan sometime next week. 6/27/2003 1:39:22 PM
|
BLD03-01027
| BLD-Other | 6/26/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 6/26/2003 at 4:47:41 PM. Contact: ###-####.
|
BLD03-01027
| BLD-Energy code compliance | 6/27/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | P | PASS |
|
|
ok to cover 6/27/2003 3:08:43 PM
|
ESC03-00470
| Site Preparation | 6/27/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | P | PART |
|
|
Discussed bmp requirements per approved plan with rp-robert--###-####. Need to install bmp's per plan, will re-inspect on Monday. 6/27/2003 2:00:22 PM
|
BLD03-01089
| BLD-Wall cover | 6/27/2003 | 6/27/2003 | 6/27/2003 12:00:00 AM | P | PASS |
|
|
Braces on gables verified. Ok to cover. 6/27/2003 2:39:23 PM
|