FIR05-00045
| INSP-Sprinkler Rough-in/Hydro | 6/24/2005 | 6/27/2005 | 6/27/2005 3:51:59 PM | P | FAIL |
|
|
Attatch retaining strap at hanger first floor nw corner, provide flexible coupling at 4" main where it passes through floor slab, provide retaining nuts on sammy screws at 2nd floor trapeze hangers, provide plans showing upright heads above exterior canopy west side, upright heads at some locations in shell areas 1st and 2nd floors are blocked by truss webs, TI demising walls, and plumbing pipe.
|
FIR05-00190
| INSP-Final Inspection | 6/27/2005 | 6/27/2005 | 6/27/2005 2:18:45 PM | P | CANC |
|
|
Cancel inspection per Phil Doble, not ready for inspection today.
|
FIR05-00226
| INSP-Final Inspection | 6/27/2005 | 6/27/2005 | 6/27/2005 2:17:02 PM | P | PASS |
|
|
Door holders have been removed, permit finaled.
|
FIR05-00069
| INSP-Sprinkler Rough-in/Hydro | 6/24/2005 | 6/27/2005 | 6/27/2005 1:42:47 PM | P | PART |
|
|
Overhead rough-in is good for cover, need all escutcheons on before final.
|
FIR04-00270
| INSP-Supply line flush | 6/24/2005 | 6/27/2005 | 6/27/2005 1:30:14 PM | P | PART |
|
|
Underground fire supply passed hydrostatic test, still need to witness UG flush.
|
FIR04-00258
| INSP-Sprinkler Rough-in/Hydro | 6/27/2005 | 6/27/2005 | 6/27/2005 12:00:00 AM | P | FAIL |
|
|
AG hydrostatic test failed, three leaks were found. Rough-in is satisfactory.
|