FIR06-00335
| INSP-Sprinkler Rough-in/Hydro | 6/26/2006 | 6/27/2006 | 6/28/2006 8:13:52 AM | P | PART |
|
|
Overhead sprinkler rough-in is good for cover at the drop ceiling areas, final pending ceiling tile and escutcheons.
|
BLD06-01831
| BLD-Conference | 6/27/2006 | 6/27/2006 | 6/28/2006 8:12:34 AM | P | DONE |
|
|
Phone conversation with contractor regarding duct smoke detection requirements for HVAC shutdown in a proposed common plenum.
|
FIR06-00232
| INSP-Final Inspection | 6/23/2006 | 6/27/2006 | 6/28/2006 8:09:05 AM | A | PASS |
|
|
Fire alarm passed final inspection.
|
FIR06-00233
| INSP-Final Inspection | 6/23/2006 | 6/27/2006 | 6/27/2006 1:56:18 PM | A | PASS |
|
|
Fire sprinkler work passed final inspection.
|
FIR06-00182
| INSP-Alarm Testing | 6/22/2006 | 6/27/2006 | 6/27/2006 1:54:35 PM | A | FAIL |
|
|
Notification device in the chemical mixing room failed to function during testing.
|
FIR05-00713
| INSP-Sprinkler Rough-in/Hydro | 6/26/2006 | 6/27/2006 | 6/27/2006 12:33:45 PM | A | FAIL |
|
|
AG hydro failed due to visible leakage at two locations not repaired from the previous inspection. UG hydrostatic test is satisfactory.
|
FIR06-00212
| INSP-Final Inspection | 6/27/2006 | 6/27/2006 | 6/27/2006 10:36:08 AM | A | PASS |
|
|
Final fire sprinkler inspection passed.
|
BLD06-00351
| FIRE-Final Inspection | 6/26/2006 | 6/27/2006 | 6/27/2006 10:11:06 AM | A | PART |
|
|
Fire life safety for the east cleanroom area passed inspection, project related FS work remains to be finaled.
|
BLD06-01341
| FIRE-Final Inspection | 6/26/2006 | 6/27/2006 | 6/27/2006 9:56:27 AM | A | PASS |
|
|
c/n items are complete, final inspection passed.
|