Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00203 INSP-Sprinkler Rough-in/Hydro6/27/20076/27/20076/28/2007 2:24:10 PMPPART
OH hydrostatic test completed satisfactory.
FIR07-00529 INSP-Alarm Testing6/26/20076/27/20076/28/2007 10:55:06 AMAPART
FACP and devices passed field testing, however activation of the manual release at the cylinder is not supervised.
FIR06-00727 INSP-Sprinkler Rough-in/Hydro6/27/20076/27/20076/27/2007 3:49:17 PMPFAIL
Partial inspection of the dry system for work completed to date as marked on plans, noted overspaced heads at some locations, heads at two areas exceed min.separation, several heads (approx. 35) have been added to cover overbuilds-need to resubmit plans reflecting changes as this work exceeds the scope allowed for field approval.
FIR06-00966 INSP-Final Inspection6/27/20076/27/20076/27/2007 3:41:12 PMPPASS
Fire sprinkler permit finaled.
BLD06-01541 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:14:19 PMANR
Project not completed for final at this time, pending corrections as discussed.
BLD06-01540 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:13:15 PMANR
Not completed for final at this time.
BLD06-01539 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:12:37 PMANR
Pending corrections as discussed.
BLD06-01537 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:11:32 PMAFAIL
Need to remove dust covers and install battey hatches at all smoke detectors, also need to provide an additional SD outside the master bedroom in the immediate vicinity- see fire code review notes for requirements.
BLD06-01535 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:10:16 PMAFAIL
Need to remove dust covers and install battey hatches at all smoke detectors, also need to provide an additional SD outside the master bedroom in the immediate vicinity- see fire code review notes for requirements.
BLD06-01538 FIRE-Final Inspection6/26/20076/27/20076/27/2007 2:06:54 PMANR
Building is not ready for final inspection at this time.
FIR07-00077 INSP-Final Inspection6/25/20076/27/20076/27/2007 1:02:41 PMAPASS
Fire alarm work passed final field inspection.
FIR07-00313 INSP-Final Inspection6/25/20076/27/20076/27/2007 12:21:06 PMAFAIL
Need map at the panel and signage at the doors to the FACP room as previously requested, vent tube configuration at all duct detectors does not appear to be installed correctly-need mfg. data submittals for verification, re-attatch one ceiling mount strobe on the 2nd floor NE corner, request as-built drawings reflecting field mods. including relocated HP, changed EOL and added horn on the 2nd floor, and deleted monitor points on the first floor, undefined points added to data entry at central station while on site.
FIR06-00800 INSP-Final Inspection6/27/20076/27/20076/27/2007 10:12:05 AMPPASS
Building shell and core fire sprinkler permit finaled.
FIR07-00316 INSP-Sprinkler Rough-in6/26/20076/27/20076/27/2007 9:53:35 AMACANC
Per phone call from contractor, UG inspection canceled.
BLD06-03574 FIRE-Final Inspection6/26/20076/27/20076/27/2007 9:51:33 AMAPASS
Building final fire life safety inspection passed.
FIR07-00311 INSP-Final Inspection6/26/20076/27/20076/27/2007 9:50:37 AMAPASS
Corrections are complete, fire sprinkler permit finaled.