FIR06-00958
| INSP-Sprinkler Rough-in/Hydro | 6/26/2007 | 6/27/2007 | 6/28/2007 10:10:20 AM | P | PASS |
|
|
The hydro for the Attic main piping and second floor passed. There were some brace issues that were remedied by the end of the inspection. The intermediate area above the kitchen is being sprinkler because the owner didn’t want to insulate as originally agreed upon. The plans for that revision have been submitted to Brian.
|
FIR07-00493
| INSP-Sprinkler Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 4:38:47 PM | A | PASS |
|
|
Sprinkler piping is ok to cover
|
FIR07-00373
| INSP-Final Inspection | 6/27/2007 | 6/27/2007 | 6/27/2007 4:36:50 PM | P | PASS |
|
|
permit finaled
|
FIR07-00447
| INSP-Final Inspection | 6/27/2007 | 6/27/2007 | 6/27/2007 4:32:36 PM | P | FAIL |
|
|
No access to building
|
BLD07-00325
| FIRE-Final Inspection | 6/26/2007 | 6/27/2007 | 6/27/2007 1:06:25 PM | A | PASS |
|
|
Life safety passed. I notified Matt, the contractor that if the access controled egress doors are installed they would have to comply with Chapter 10 of the IFC and IBC.
|
BLD07-00938
| FIRE-Final Inspection | 6/26/2007 | 6/27/2007 | 6/27/2007 1:03:57 PM | A | PASS |
|
|
Life safety passed. I notified Matt, the contractor that if the access controled egress doors are installed they would have to comply with Chapter 10 of the IFC and IBC.
|
BLD06-00718
| FIRE-Final Inspection | 6/26/2007 | 6/27/2007 | 6/27/2007 12:03:46 PM | A | PASS |
|
|
Life safety passed.
|
FIR07-00103
| INSP-Sprinkler Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 11:55:24 AM | A | PASS |
|
|
The two pendants in the south side soffit of the second floor elevator lobby are ok to cover
|
FIR07-00248
| INSP-Supply line flush | 6/26/2007 | 6/27/2007 | 6/27/2007 10:05:47 AM | A | FAIL |
|
|
UG Flush Inspection was not ready. I performed a partial sprinkler rough-in and noted deficiencies such as upright heads blocked by duct work, missing protection under stair landings and upright heads not centered between the trusses.
|