Inspections for the day of: Wednesday, June 27, 2012.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00276 INSP-Sprinkler Rough-in6/27/20126/27/20126/27/2012 3:48:42 PMPPASS
The sprinkler piping for the new head outside of the "cash room" is ok to cover.
BLD11-00937 FIRE-Final Inspection6/27/20126/27/20126/27/2012 3:15:21 PMPFAIL
Life safety will be ok to sign off when the exit sign is replaced as discussed and the project related fire alarm permit.
FIR12-00026 INSP-Final Inspection6/27/20126/27/20126/27/2012 2:40:25 PMPFAIL
The strobes sync. but the horns do not. Per the contractor they did sync until the two additional devices were added today. The fire alarm contractor is going to investigate the cause and/or contact the fire marshal if this is a new device versus an old device issue. EOL was verified.
FIR12-00057 INSP-Final Inspection6/27/20126/27/20126/27/2012 11:36:30 AMPPASS
Permit finaled.
FIR12-00150 INSP-Final Inspection6/27/20126/27/20126/27/2012 11:35:47 AMPPASS
Permit finaled. Room integrity test witnessed as well.
FIR12-00151 INSP-Alarm Testing6/25/20126/27/20126/27/2012 11:34:40 AMADONE
To complete phase I the fire dampers and the hvac unit shutdown needs to be tested. Interconnections with the clean agent system and the pre-action system have been completed. Supervision of the NAC panels has been verified. Several strobes are overspaced and candella's mislabeled on the plans. Plans need to be submitted showing the phase 3 work.