FIR12-00276
| INSP-Sprinkler Rough-in | 6/27/2012 | 6/27/2012 | 6/27/2012 3:48:42 PM | P | PASS |
|
|
The sprinkler piping for the new head outside of the "cash room" is ok to cover.
|
BLD11-00937
| FIRE-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 3:15:21 PM | P | FAIL |
|
|
Life safety will be ok to sign off when the exit sign is replaced as discussed and the project related fire alarm permit.
|
FIR12-00026
| INSP-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 2:40:25 PM | P | FAIL |
|
|
The strobes sync. but the horns do not. Per the contractor they did sync until the two additional devices were added today. The fire alarm contractor is going to investigate the cause and/or contact the fire marshal if this is a new device versus an old device issue. EOL was verified.
|
FIR12-00057
| INSP-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 11:36:30 AM | P | PASS |
|
|
Permit finaled.
|
FIR12-00150
| INSP-Final Inspection | 6/27/2012 | 6/27/2012 | 6/27/2012 11:35:47 AM | P | PASS |
|
|
Permit finaled. Room integrity test witnessed as well.
|
FIR12-00151
| INSP-Alarm Testing | 6/25/2012 | 6/27/2012 | 6/27/2012 11:34:40 AM | A | DONE |
|
|
To complete phase I the fire dampers and the hvac unit shutdown needs to be tested. Interconnections with the clean agent system and the pre-action system have been completed. Supervision of the NAC panels has been verified. Several strobes are overspaced and candella's mislabeled on the plans. Plans need to be submitted showing the phase 3 work.
|