BLD13-01372
| FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/28/2013 11:50:11 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD13-01203
| FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/27/2013 4:46:13 PM | A | PASS |
|
|
Fire life safety inspection passed.
|
FIR12-00586
| INSP-Sprinkler Rough-in | 6/26/2013 | 6/27/2013 | 6/27/2013 4:45:17 PM | A | PART |
|
|
|
BLD13-01653
| FIRE-Final Inspection | 6/27/2013 | 6/27/2013 | 6/27/2013 4:42:15 PM | P | PASS |
|
|
Life safety okay pending approved door hardware is installed at the main entry/exit as discussed and completed prior to structural final. PFE is due annual certification this month.
|
BLD13-01405
| FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/27/2013 4:39:23 PM | A | FAIL |
|
|
Fire extinguisher is overdue annual certification, provide approved hardware at the restroom door.
|
BLD13-01619
| FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/27/2013 4:35:45 PM | A | FAIL |
|
|
Noted several items in need of correction- refer to annotations on permit documents, need to replace/repair drop ceilings, request electrical inspection, exiting and egress components to meet plan review, items 1-4 are not met.
|
FIR13-00083
| INSP-Final Inspection | 6/27/2013 | 6/27/2013 | 6/27/2013 4:26:17 PM | A | PART |
|
|
Relocated tamper and flow switches tested okay. Notification adjustments completed. Final pending heat tape installation/supervision.
|