Inspections for the day of: Friday, June 27, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03201 FIRE-Final Inspection6/26/20146/27/20146/27/2014 3:51:54 PMAFAIL
Life safety is ok except the floor plan needs to be resubmitted showing the door on the west end being deleted.
FIR14-00222 INSP-Sprinkler Rough-in6/26/20146/27/20146/27/2014 2:54:27 PMPDONE
Inspection was part rough-in and part conference. The dry sprig ups, per conversation with Anthony, are too far from the deck but it appears that Anthony has a solution. I started the rough-in inspection for the piping under the mezzanine but stopped after finding pipe re-routing, elevation changes and alot of additional fittings. Also the "interstitial" space above the first floor ceiling and the second floor is a combustible concealed space with no sprinkler protection. After finding these items I determined that a plan modification will be needed so I stopped inspecting this area. I continued with the upper level piping and found for the most part the rough-in is passed but 25% of the piping has not been instlled yet as well as all of the branchline seimic bracing and earthquake bracing has not been installed yet. There has also been minor pipe routing changes and additional fittings here as well. I also found atleast one flat face bushing being used to reduce a 1 1/2" pipe to 1 1/4".

Per Anthony and I's conversation today, I will be requested to come back out after the plan modifications are approved for a re-inspection.
FIR14-00240 INSP-Sprinkler Rough-in6/26/20146/27/20146/27/2014 2:23:46 PMPPASS
Rough-in passed in the Lab area. Piping can be covered.
BLD14-01234 FIRE-Final Inspection6/27/20146/27/20146/27/2014 1:48:43 PMPPASS
Life safety passed
BLD14-01234 FIRE-Conference6/27/20146/27/20146/27/2014 11:39:08 AMPDONE
Verbally went over sprinkler requirements with Ben
FIR14-00237 INSP-Final Inspection6/26/20146/27/20146/27/2014 10:53:06 AMAPASS
Permit finaled
FIR14-00352 INSP-Final Inspection6/26/20146/27/20146/27/2014 10:52:49 AMAPASS
Permit finaled
FIR14-00230 INSP-Final Inspection6/26/20146/27/20146/27/2014 10:52:17 AMAPASS
Permit finaled
FIR14-00222 INSP-Sprinkler Rough-in6/26/20146/27/20146/26/2014 9:38:04 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello