Inspections for the day of: Friday, June 27, 2014.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00749 DOC - Permit Finaled6/27/20146/27/20146/27/2014 11:52:05 AMPPASS
ESC13-00749 Site Final6/27/20146/27/20146/27/2014 11:51:41 AMPPASS
Project is complete and disturbed area stabilized and construction materials on adjacent lot removed. No corrections. ESC conditions satisfied.
ESC13-00344 General Inspection6/27/20146/27/20146/27/2014 11:43:22 AM PASS
Boulder Heights #5 hillsides have revegetated well. Stockpile is still at top of Windsong with a seperate permit. SFHs all have individual permits. No trackout on streets. Gutters and DI coir mats are in good conditions.
ESC13-01002 General Inspection6/27/20146/27/20146/27/2014 11:27:11 AM PASS
ESC13-01090 Aging Inspection6/27/20146/27/20146/27/2014 11:20:00 AM PASS
Finaled.
ESC13-01090 DOC - Permit Finaled6/27/20146/27/20146/27/2014 11:19:23 AMPPASS
House complete, permits finaled, landscaped and occupied. ESC conditions fulfilled.
ESC11-00879 General Inspection6/27/20146/27/20146/27/2014 10:48:28 AM PASS
BMPs in good condtion. Permit posted and SWPPP on site. No corrections required.
ESC13-01151 Random Inspection6/27/20146/27/20146/27/2014 10:37:50 AMPPART
Need to sweep street and gutter in front of house and about 30 feet down hiill on Hackberrry.

Called GC Robert Bruno to disclose corrections. First correction notice at site.
ESC14-00266 General Inspection6/27/20146/27/20146/27/2014 10:30:10 AM FAIL
Corrections required:

1. Sweep sidewalk and gutter since construction access has been buried.
2. Provide more capacity for concrete washout.
3. Provide new trash container. Currently just a pile of trash and wood scraps.

Verbal correction request issued to RP Dylan. He agreed to make corrections ASAP. Site has typically been in compliance.
ESC14-00294 General Inspection6/27/20146/27/20146/27/2014 10:08:13 AM PASS
Building project is complete but landscaping crews are still working in the yard and have stockpiled materials. No sediment leaving site.
ESC13-01086 Aging Inspection6/27/20146/27/20146/27/2014 9:33:17 AM PASS
Finaled.
ESC13-01086 DOC - Permit Finaled6/27/20146/27/20146/27/2014 9:33:05 AMPPASS
Project complete. ESC conditions satisfied.
ESC13-00481 DOC - Permit Finaled6/27/20146/27/20146/27/2014 9:02:14 AMPPASS
ESC13-00481 General Inspection6/27/20146/27/20146/27/2014 9:01:41 AM PASS
Union Square Phase II is complete. No further construction. All disturbed areas landscaped and stabilized including the temporary staging area across Smoke Ranch. ESC conditions satisfied.
ESC13-01078 Aging Inspection6/27/20146/27/20146/27/2014 8:45:44 AM PASS
WIP. No violations.