ESC16-00489
| General Inspection | 6/24/2016 | 6/27/2016 | 6/28/2016 10:39:19 AM | A | PART |
|
|
WIP on subdivsion grading and earth moving to raise the area that is within Warm Spring Creek flood plain. Observed significant amount of fugitive dust due to dump truck speeding on the haul road. Water truck is on site for dust control and when no hauling dust is under control.
Correction request: - continue dust suppressing rounds with water truck, focus on stockpiles to be moved and the haul road. - install rock construction entrance or continue with bi-weekly sweeping. CA Paving Jesse stated streets would be swept tonight.
No other violations observed, surrounding storm drains have sediment protection. Creek buffer being observed, no water flowing in creek at this time.
|
ESC15-00871
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 4:07:44 PM | | PASS |
|
|
|
ESC15-00908
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 3:30:07 PM | | PASS |
|
|
Work complete. No ESC corrections needed
|
ESC15-00908
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 3:29:18 PM | P | PASS |
|
|
|
ESC16-00168
| Random Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 3:05:34 PM | P | PASS |
|
|
No construction actviity. No fugitive from graded area. Relocated wetland is in process of re-establishing.
No corrections issued at this time. Check for stabilization next inspection.
|
ESC16-00427
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 2:43:31 PM | P | PASS |
|
|
WIP on grading for pathway on east side of the creek/irrigation channel. Footings for bridge span are poured and located outside the vegetative buffer. Bank vegetation has been preserved, no work occuring in creek. No violations.
|
ESC14-01019
| Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 2:18:44 PM | | PASS |
|
|
Home complete, landscaped and cleaned up. Active project ongoing on Gatewood, same builder.
|
ESC14-01019
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 2:18:20 PM | P | PASS |
|
|
|
ESC14-01020
| Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 2:17:36 PM | | PASS |
|
|
Home complete, landscaped and cleaned up. Active project ongoing on Gatewood, same builder.
|
ESC14-01020
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 2:08:49 PM | P | PASS |
|
|
|
ESC16-00615
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 1:42:14 PM | P | FAIL |
|
|
Corrections needed:
- install silt fence to west of home - sweep up gutters within 23rd Lane - Ellington Place - haul away trash and concrete chunks. Stabilize stockpiles to prevent fugitive dust.
See subdivision permit ESC15-00015
|
ESC15-01530
| Site Final | 6/27/2016 | 6/27/2016 | 6/27/2016 1:39:04 PM | P | PASS |
|
|
DARREN Phone #: ###-####
No exterior disturbance. Demolished and waste materials hauled away. No loose debris or other construction dust in either north or south parking lots. No temp BMP removal was necessary. ESC permit condtions satisfied.
|
ESC15-01270
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 11:48:19 AM | | PASS |
|
|
|
ESC14-00588
| General Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 10:36:19 AM | | PASS |
|
|
WIP on interior of aparment complex and roofing. No earthwork, no changes to irrigation ditch outlet and no issues or plume or observed at Logger's Creek.
Trackout controls (rock entrance, rumble bars) are installed at both access points. No fugitve dust or construction debris leaving site. No corrections at this time.
|
ESC14-01059
| Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 10:07:39 AM | | PASS |
|
|
All disturbed area during construction is now stabilized. Permeable pavers installed in parking lot. No temp BMPs remaining. ESC permit condtions satified. BLD open for minor corrections.
|
ESC14-01059
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 10:06:13 AM | P | PASS |
|
|
|
ESC15-01097
| Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 9:38:17 AM | | PASS |
|
|
Residential pool at new home is complete and disturbed area stabilized. BLD finaled, ESC conditions satisfied.
|
ESC15-01097
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 9:37:38 AM | P | PASS |
|
|
|
ESC15-01057
| DOC - Permit Finaled | 6/27/2016 | 6/27/2016 | 6/27/2016 8:52:38 AM | P | PASS |
|
|
|
ESC15-01057
| Aging Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 8:52:27 AM | | PASS |
|
|
Home complete. Landscaping and final clean up on Brookridge SFHs in DHE#12 is in progress. Tahoe will continue working to the east in DHE phases 13-14. Active homes in compliance and permitted seperately. No further inspections on this permit.
|