FIR17-00329
| INSP-Conference | 6/27/2017 | 6/27/2017 | 6/27/2017 1:59:16 PM | P | PASS |
|
|
The underground supply piping is ok for cover
|
NAF16-00084
| INSP-Final | 6/26/2017 | 6/27/2017 | 6/27/2017 1:56:52 PM | A | CANC |
|
|
The fire alarm contractor is not ready for testing yet
|
FIR17-00144
| INSP-Sprinkler Rough-in/Hydro | 6/26/2017 | 6/27/2017 | 6/27/2017 10:21:17 AM | A | CANC |
|
|
Can't do the hydro test until all of the heads have been cut in and piping installed
|
FIR17-00217
| INSP-Sprinkler Rough-in/Hydro | 6/26/2017 | 6/27/2017 | 6/27/2017 10:20:38 AM | A | FAIL |
|
|
Standpipe hydro failed due to visable leak at the 90/check valve
|
BLD17-01785
| FIRE-Final Inspection | 6/22/2017 | 6/27/2017 | 6/27/2017 9:50:06 AM | A | FAIL |
|
|
The point of contact did not answer phone, business was unlocked and plans on counter.
Contact plan review/addressing to get the correct address, plans indicate 6909 but tenant space is addressed as 6927. Provide testing of the exit sign/emergency light. Provide one 2A, 10BC fire extinguisher with current inspection tag from a certified company, mount in a normal path of travel no higher than 5' and lower than 4".
mary (ext. 1) Phone #: ###-####
|
FIR16-00284
| INSP-Sprinkler Rough-in | 6/26/2017 | 6/27/2017 | 6/27/2017 9:28:01 AM | A | PASS |
|
|
Third floor corridor soffits are ok to cover
|