Inspections for the day of: Tuesday, June 27, 2017.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00172 FIRE-Final Inspection6/27/20176/27/20176/27/2017 3:08:11 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place by main entry, luminous egress path markings for stairwell number 2 to be installed. Final life fire safety inspection passed/complete.
BLD16-00172 Extend Permit 90/180 days6/27/20176/27/20176/27/2017 3:04:19 PMPCANC
BLD15-03621 FIRE-Final Inspection6/27/20176/27/20176/27/2017 3:02:22 PMPCANC
Duplicate inspection request.
BLD16-00049 FIRE-Final Inspection6/27/20176/27/20176/27/2017 2:54:34 PMPPASS
Final life fire safety inspection for this permit passed/complete
BLD15-03621 FIRE-Final Inspection6/27/20176/27/20176/27/2017 2:50:46 PMPPASS
Final life fire safety inspection for this permit passed/complete
FIR16-00701 INSP-Supply line flush6/26/20176/27/20176/27/2017 1:50:37 PMPDONE
Underground flush for southeast riser room complete.
FIR17-00159 INSP-Sprinkler Rough-in/Hydro6/26/20176/27/20176/27/2017 12:24:37 PMAPASS
Hydrostatic test for overhead fire sprinkler piping in area of work complete. Rough in inspection complete.
FIR16-00697 INSP-Sprinkler Rough-in6/27/20176/27/20176/27/2017 10:58:54 AMAPASS
Rough to ocver inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
FIR16-00040 INSP-Sprinkler Rough-in/Hydro6/26/20176/27/20176/27/2017 10:14:11 AMAPASS
Hydrostatic test performed after repair was made on the northeast underground supply complete.
BLD17-00694 FIRE-Conference6/26/20176/27/20176/27/2017 10:13:08 AMADONE
Fire conference complete
FIR17-00334 INSP-Conference6/26/20176/27/20176/27/2017 9:34:35 AMADONE
Fire conference complete, manual pull station will be mounted in discussed location.
FIR17-00239 INSP-Final Inspection6/26/20176/27/20176/27/2017 8:35:29 AMAPASS
Final fire sprinkler inspection passed/complete