Inspections for the day of: Friday, June 28, 1996.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-00091 INSP - Framing/Rough-in6/28/19966/28/19966/28/1996 12:00:00 AM PASS
/ / 350 - OK TO INSULATE
BLD96-00091 INSP - Framing/Rough-in6/28/19966/28/19966/28/1996 12:00:00 AM PASS
/ / 350 - OK TO INSULATE
MEC96-01521 INSP - Final6/27/19966/28/19966/28/1996 12:00:00 AMACANC
CALLED AND CHANGED FROM AM TO PM. AJB
MEC96-01521 INSP - Final6/27/19966/28/19966/28/1996 12:00:00 AMACANC
CALLED AND CHANGED FROM AM TO PM. AJB
MEC96-00569 INSP - Final6/27/19966/28/19966/28/1996 12:00:00 AMAPASS
06/28/96 350 - CORRECTIONS MADE FINAL COULDN'T FIND A CARD TO SIGN SO LE
MEC96-00569 INSP - Final6/27/19966/28/19966/28/1996 12:00:00 AMAPASS
06/28/96 350 - CORRECTIONS MADE FINAL COULDN'T FIND A CARD TO SIGN SO LE
MEC96-01851 INSP - Retro Fit (check note)6/27/19966/28/19966/28/1996 12:00:00 AMACANC
06/28/96 350 - FURNACE / WH AND A G/T already done
MEC96-01854 INSP - Gas pressure test6/27/19966/28/19966/28/1996 12:00:00 AMAPASS
06/28/96 350 - what are they hooking up to????and who is doing that????? THIS IS A UNDERGROUND GASLINE OUT TO A RESIDENTIAL BBQ. SO ONLY GASPIPIN NEEDS PERMIT FINAL
MEC96-01861 INSP - Air conditioning6/28/19966/28/19966/28/1996 12:00:00 AMPPASS
06/28/96 350 - ###-####-CHARLES WILL MEET YOU OUT THERE-HE MIGHT EVEN BE A/C OK TWO DRAINS TO OUTSIDE, NO ACCESS TO BUILDING FINAL
MEC96-01521 INSP - Final6/28/19966/28/19966/28/1996 12:00:00 AMPFAIL
06/28/96 350 - WAS SCHEDULED FOR TODAY AM, CHANGED TO PM. AJB NOT READY FOR FINAL NEED TO FINISH CORRECTIONS
MEC96-01521 INSP - Final6/28/19966/28/19966/28/1996 12:00:00 AMPFAIL
06/28/96 350 - WAS SCHEDULED FOR TODAY AM, CHANGED TO PM. AJB NOT READY FOR FINAL NEED TO FINISH CORRECTIONS
MEC96-01618 INSP - Framing/ Rough-in6/28/19966/28/19966/28/1996 12:00:00 AMPPASS
06/28/96 350 - REINSPECTION R/I OK CORRECTIONS MADE
MEC96-01772 INSP - Framing/ Rough-in6/27/19966/28/19966/28/1996 12:00:00 AMPPART
06/28/96 350 - BLVD OFC BLDG-8 GAS PACK-ROOFTOP UNITS-EXHAUST FANS-GAS P WORK.BLD95-2149-FINAL CERT OF VALUE 48520.00. R/I OK FOR 1ST FLOOR WILL NEED ANOTHER INSPECTION FOR 2ND FLOOR LATER
MEC96-01796 INSP - Rough-in & Gas Pressure6/28/19966/28/19966/28/1996 12:00:00 AMPPART
06/28/96 350 - NO R/I CORRECTIONS P/T OK #28239
BLD96-00596 INSP - Framing/Rough-in6/28/19966/28/19966/28/1996 12:00:00 AMPPASS
06/28/96 350 - REINSPECT FRAME CORRECTIONS MADE OK TO INSULATE
BLD96-00835 INSP - Framing/Rough-in6/28/19966/28/19966/28/1996 12:00:00 AMPPASS
06/28/96 350 - PM REINSPECT FRAME CORRECTIONS MADE OK TO COVER