Inspections for the day of: Wednesday, June 28, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00286 BLD-Footing6/27/20006/28/20006/28/2000 12:00:00 AMAPART
bRUCE ###-#### pending report s/i. 6/27/00 2:32:12 PM pending report s/i. 6/28/00 10:29:19 AM
BLD00-00286 BLD-Concrete6/27/20006/28/20006/28/2000 12:00:00 AMAPART
masonary ###-#### bruce pending report s/i. 6/27/00 2:31:46 PM pending report s/i 6/28/00 10:28:44 AM
BLD99-02922 BLD-Conference6/27/20006/28/20006/28/2000 12:00:00 AMAPART
Wayne ###-####
BLD99-01573 BLD-Framing/Rough-in6/27/20006/28/20006/28/2000 12:00:00 AMAPART
Wayne ###-####
BLD00-00692 BLD-Final6/27/20006/28/20006/28/2000 12:00:00 AMAPART
temp occ Gene ###-#### please call before you go out temp ok pending ele sign off final will be ok no reson to reinspect upon signoff of ele. 6/28/00 11:20:58 AM
BLD99-01723 BLD-Framing/Rough-in6/27/20006/28/20006/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/27/2000 at 14:27:46. Contact: ###-####. framing fire stopping insulation ok. 6/28/00 10:57:57 AM
BLD00-01474 BLD-Footing6/27/20006/28/20006/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/27/2000 at 15:26:57. Contact: ###-####.
BLD00-00310 BLD-Framing/Rough-in6/27/20006/28/20006/28/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/27/2000 at 21:30:15. Contact: ###-####. interior sheer ok. 6/28/00 3:26:28 PM
BLD99-02469 BLD-Final6/28/20006/28/20006/28/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/28/2000 at 07:43:33. Contact: .
BLD00-00062 BLD-Framing/Rough-in6/28/20006/28/20006/28/2000 12:00:00 AMPPART
Tim Hansen ###-#### need resub mital for footings. 6/28/00 3:17:47 PM
BLD00-01614 BLD-Footing6/28/20006/28/20006/28/2000 12:00:00 AMPPASS
###-####