BLD00-03580
| FIRE-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | FAIL |
|
|
Final Fail C/N issued 6/28/2001 11:27:16 AM
|
BLD00-01225
| FIRE-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | FAIL |
|
|
Final Fail C/N issued 6/28/2001 9:20:25 AM
|
BLD00-03593
| FIRE-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PASS |
|
|
###-#### Reinsp OK for permanant occupancy 6/28/2001 10:24:42 AM
|
FIR01-00369
| INSP-Sprinkler Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | PART |
|
|
OK to cover supply line. FDC and Standpipe lines only stubbed 5 ft from riser room.Lines to be run to above ground location later. 6/28/2001 1:59:19 PM
|
FIR00-00693
| INSP-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | CANC |
|
|
###-####
|
BLD01-01053
| FIRE-Final Inspection | 6/28/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | FAIL |
|
|
Final Fail Test AHU duct detectors and move 1 exit sign 6/28/2001 2:46:12 PM
|