BLD01-00729
| BLD-Footing | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PART |
|
|
Clay ###-#### ok subject to special insp. 6/28/2001 9:10:18 AM
|
MEC01-01806
| Final | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PASS |
|
|
|
MEC01-01806
| Pressure Test | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PASS |
|
|
###-#### CALL FIRST
|
BLD00-02815
| BLD-Framing/Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PART |
|
|
partial framing shear wall tim ###-#### ok to side 6/28/2001 11:26:35 AM
|
BLD00-02813
| BLD-Framing/Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | A | PART |
|
|
###-#### ok to side 6/28/2001 11:26:20 AM
|
BLD01-01473
| BLD-Footing | 6/27/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 17:10:14. Contact: .contractor just showed up at 2:15 ,said he has mud schedualed for 3:00,told him id come back latter went over set backs .. 6/28/2001 3:49:04 PM 6/28/2001 3:49:18 PM
|
BLD01-00737
| BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | PART |
|
|
pouring at 1:30 clay ###-####
|
BLD01-00737
| BLD-Foundation | 6/28/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | PART |
|
|
clay pouring at1:30 ###-####
|
BLD01-01683
| BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-01473
| BLD-Footing | 6/28/2001 | 6/28/2001 | 6/28/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 6/28/2001 3:51:42 PM now 3:45 has been poured set backs ok and verts visible along with top bar which will be in wall.
|
BLD00-02769
| BLD-Framing/Rough-in | 6/27/2001 | 6/28/2001 | 6/27/2001 12:00:00 AM | A | CANC |
|
|
shear wall partial framing Tim ###-####
|