ELE02-01832
| Electrical Rough-In | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
dale ###-#### dividing wall only ok 6/28/2002 11:02:20 AM
|
ELE02-01541
| Final | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | FAIL |
|
|
KENNY ###-#### called contractor for information x-ray unit not listed?, and needs redundant grd path, and remove cord installed in wall 6/28/2002 1:36:25 PM
|
ELE02-01946
| Rough-In Permanent Service | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
###-#### no r/i
p/s o/h rec ok 6/27/2002 5:54:54 PM
|
ELE01-04209
| Final | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
meet with owner in the AM ok 6/28/2002 2:05:32 PM
|
ELE02-01945
| Rough-In Permanent Service | 6/26/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
ZANE ###-#### r/i ok all 4 units
p/s u/g new ok 6/28/2002 10:33:30 AM
|
ELE02-01916
| Electrical Rough-In | 6/26/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
###-#### call to meet there no r/i conference only cow p/s is a mess 6/28/2002 11:39:08 AM
|
ELE02-01311
| Final | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 08:51:22. Contact: ###-####. no cor. posted called too many things in violation will meet with contractor at job site a/c units on roof 6/28/2002 3:43:26 PM
|
ELE02-00182
| Electrical Rough-In | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PART |
|
|
###-#### mark r/i for upstairs ok and conference ok 6/28/2002 3:18:14 PM
|
ELE02-01990
| Rough-In Permanent Service | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PASS |
|
|
PAT ###-#### ok a/c uni 6/28/2002 4:18:54 PM ok a/c 6/28/2002 4:19:14 PM
|
ELE02-01541
| Final | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | NR |
|
|
|
ELE02-01957
| Final | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 10:35:28. Contact: ###-#### called corrections are needs gfci receptacle within 25 ft of a/c install grd screw at disconnect, and #10 A W G protected by 50 amp breaker in panel 6/28/2002 4:41:19 PM
|