PLM02-00605
| Final | 6/26/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 15:51:39. Contact: ###-####.
|
PLM02-01710
| Final | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 10:07:26. Contact: ###-####. set ice mech. east side complete sink and assoc. equipment west side temp occ ok 6/28/2002 9:30:21 AM
|
PLM02-01792
| Plumbing Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 06:52:23. Contact: ###-####.
|
PLM02-01917
| Sprinkler (Final) | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
LARRY ###-####
|
PLM02-01894
| Plumbing Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 14:42:42. Contact: ###-####.
|
PLM02-01890
| Plumbing Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 16:50:10. Contact: .
|
PLM02-01900
| Sprinkler (Final) | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PASS |
|
|
STEVEN ###-####
|
PLM02-01862
| Final | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PART |
|
|
KIRK ###-#### premise dcva ok but thr boiler needs an rp 6/28/2002 11:01:59 AM
|
PLM02-01928
| Plumbing Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PART |
|
|
charles ###-#### tie in at meter ok needs to connect under house and sprinkler system and test backflow preventor. 6/28/2002 2:01:37 PM
|
PLM02-00697
| Final | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 10:10:43. Contact: ###-####.
|
PLM02-01913
| Sprinkler (Final) | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PASS |
|
|
backflow ron-###-####
|
PLM02-00605
| Final | 6/26/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 15:53:33. Contact: ###-####. this is also for plm02-01074--label all backflow preventors, move hub drains out of cabinets per conversation at r/i, tighten all c.o. plugs, set all equipment, label med gas at each station, screen dental air and compressed air inlet/outlet, install protective covers at all future med gas stations, install plugs at all future station inlets/outlets, glue all joints in the dental vacuum system, have med gas system certified. 6/28/2002 4:02:46 PM
|