BLD02-00762
| BLD-Conference | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PASS |
|
|
WALTER ###-####: re 1 hr stair enclosure; ok to use standard 1hr assy...extend gyp to floor deck. 6/28/2002 2:14:05 PM
|
BLD02-01162
| BLD-Framing/Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
###-#### ceiling ok to tile pend elec. 6/28/2002 2:14:26 PM
|
BLD02-01160
| BLD-Framing/Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
###-#### ceiling ok pend elec. 6/28/2002 2:16:28 PM
|
BLD02-01161
| BLD-Framing/Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
###-#### ceiling dave ok to tile pend elec 6/28/2002 5:29:51 PM
|
BLD02-01337
| BLD-Framing/Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
###-#### ceiling dave ok to tile pend elec. 6/28/2002 5:30:08 PM
|
BLD02-01353
| BLD-Wall cover | 6/27/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | A | PART |
|
|
ERIC ###-#### wall, looks ok...plan unclear...hd's installed at corner, steel in 6/28/2002 2:48:21 PM
|
BLD02-01353
| BLD-Wall cover | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PART |
|
|
fnd, not frame insp. 6/28/2002 5:30:30 PM
|
MEC02-01724
| Final | 6/28/2002 | 6/28/2002 | 6/28/2002 12:00:00 AM | P | PART |
|
|
fp only 7/8/2002 10:11:36 AM
|