Inspections for the day of: Friday, June 28, 2002.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01162 FIRE-Final Inspection6/28/20026/28/20027/1/2002 12:00:00 AMPPASS
dave- ###-####
BLD02-01160 FIRE-Final Inspection6/28/20026/28/20027/1/2002 12:00:00 AMPPASS
dave- ###-####
BLD02-01161 FIRE-Final Inspection6/28/20026/28/20027/1/2002 12:00:00 AMPPASS
dave- ###-####
BLD02-01337 FIRE-Final Inspection6/28/20026/28/20027/1/2002 12:00:00 AMPPASS
dave- ###-####
FIR02-00166 INSP-Supply line flush6/28/20026/28/20026/28/2002 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 6/28/2002 11:00:23 AM underground flush okay; need hydro 6/28/2002 11:04:08 AM
BLD01-01935 FIRE-Conference6/28/20026/28/20026/28/2002 12:00:00 AMAPART
Added by Inspector: 409 On 6/28/2002 11:03:38 AM spoke to GC - alarm plans aren't approved and told not proceed further until alarm plans are approved
FIR02-00169 INSP-Alarm Testing6/26/20026/28/20026/28/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/26/2002 at 13:15:54. Contact: ###-####. need AV in corridor 133 per plans; detector for damper 6/28/2002 8:50:33 AM
FIR02-00231 INSP-Alarm Testing6/26/20026/28/20026/28/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/26/2002 at 13:17:08. Contact: ###-####. pull station obstructed by door 6/28/2002 9:53:37 AM
FIR02-00208 INSP-Sprinkler Rough-in/Hydro6/27/20026/28/20026/28/2002 12:00:00 AMAPART
###-#### pager rick r/i okay; need tenting prior to approval for cover 6/28/2002 11:04:39 AM
FIR02-00195 INSP-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 6/28/2002 8:43:35 AM
BLD02-00444 FIRE-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMAFAIL
Added by Inspector: 409 On 6/28/2002 8:43:11 AM detector for SFD at lobby; rated door to stair; add AV device to corridor 133; extinguishers
FIR02-00216 INSP-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 6/28/2002 9:51:49 AM
BLD02-00978 FIRE-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMAFAIL
Added by Inspector: 409 On 6/28/2002 9:53:17 AM extinguishers; pull station obstructed by door
FIR01-00422 INSP-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMPFAIL
###-#### need spare heads that don't have bent deflectors 6/28/2002 1:58:05 PM
BLD01-02154 FIRE-Final Inspection6/27/20026/28/20026/28/2002 12:00:00 AMPPASS
fn fire- terry- ###-#### building 1 is okay; GC wanted building two but paved access won't be in until late July - won't approve until paved access is complete 6/28/2002 2:19:29 PM
BLD01-03261 FIRE-Final Inspection6/27/20026/28/20026/28/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/27/2002 at 11:01:37. Contact: ###-####. door hardware at two exits; need passage set for hallway door; gas labeling; resubmittal wasn't on site for curb change at entrance 6/28/2002 3:29:02 PM
FIR02-00252 INSP-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMPFAIL
fire fn ###-#### brian head within 1 inch of ceiling in east classroom; 6/28/2002 4:02:46 PM
BLD01-00684 FIRE-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 6/28/2002 1:59:28 PM
BLD01-00645 FIRE-Final Inspection6/28/20026/28/20026/28/2002 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 6/28/2002 2:00:11 PM