Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00051 INSP-Conference6/14/20056/28/20056/28/2005 4:24:55 PMPNR
I left message on Jason's phone for job status
FIR05-00284 INSP-Final Inspection6/27/20056/28/20056/28/2005 4:24:03 PMPCANC
JACK; Phone #: ###-#### To be rescheduled for Friday
FIR05-00209 INSP-Final Inspection6/27/20056/28/20056/28/2005 2:30:53 PMPFAIL
This inspection was for the sprinkler modifications on the dry system under Concourse B. Need to replace/repair fire proofing affected by hangers and eq bracing, provide hydrostatic test papers and trip test the dry system. Hydro test passed.
FIR05-00209 INSP-Sprinkler Rough-in/Hydro6/27/20056/28/20056/28/2005 2:30:10 PMPPASS
This inspection was for the sprinkler modifications on the dry system under Concourse B. Need to replace/repair fire proofing affected by hangers and eq bracing, provide hydrostatic test papers and trip test the dry system. Hydro test passed.
FIR05-00156 FIR-Aging Inspection6/28/20056/28/20056/28/2005 10:34:54 AM NR
work is in progress
MIS05-00068 FIR-Final6/27/20056/28/20056/28/2005 10:32:50 AMAPASS
Fire life safety finaled
BLD04-02203 FIRE-Final Inspection6/28/20056/28/20056/28/2005 10:21:00 AMAPART
Early Completion area is ok to occupy. The pocket door in the pharmacy still needs ada approved hardware prior to a final.
FIR05-00190 INSP-Final Inspection6/28/20056/28/20056/28/2005 10:20:04 AMAPART
Early Completion area "C" passed. Heads corrected in GS202 and GS203. Inspected two additional pendant heads which have been circled and dated on city approved plans.
FIR05-00274 INSP-Sprinkler Rough-in/Hydro6/27/20056/28/20056/28/2005 9:21:46 AMAFAIL
No approved plans on site. No inspection done.
FIR05-00244 INSP-Sprinkler Rough-in/Hydro6/22/20056/28/20056/28/2005 9:04:32 AMAFAIL
Need to certify the fire extinguisher on the first floor and remove all construction debris piles on all floors.
FIR05-00277 INSP-Sprinkler Rough-in6/27/20056/28/20056/28/2005 8:36:06 AMAPASS
Rough-in for this tenant space is ok. Ceiling tile is ok to install. Items on the shell correction notice for this area have been corrected.