FIR06-00478
| INSP-Final Inspection | 6/28/2006 | 6/28/2006 | 6/29/2006 9:24:22 AM | P | CANC |
|
|
don ###-#### Project is not ready for inspection per phone call from contractor.
|
FIR06-00258
| INSP-Alarm Testing | 6/27/2006 | 6/28/2006 | 6/28/2006 3:38:18 PM | P | PART |
|
|
Inspection of alarm devices in phase two of the remodeled floor area are acceptable, still need to install one missing notification device in the west corridor as circled on plans and test phase 3 of the floor remodel when completed.
|
BLD06-00317
| FIRE-Final Inspection | 6/27/2006 | 6/28/2006 | 6/28/2006 3:35:37 PM | P | PART |
|
|
Partial inspection for phase 2 of the floor remodel is satisfactory.
|
FIR05-00330
| INSP-Final Inspection | 6/28/2006 | 6/28/2006 | 6/28/2006 2:22:21 PM | P | PASS |
|
|
Final inspection is satisfactory, record of completion forms not available at the time of inspection, contractor to provide at next meeting, permit finaled.
|
FIR06-00128
| INSP-Final Inspection | 6/28/2006 | 6/28/2006 | 6/28/2006 2:15:35 PM | P | FAIL |
|
|
PIV tamper is adjusted incorrectly, provide "911" sign at the outside bell, the automatic ball drip for the FDC will not function as installed, no other items inspected for final at this time.
|
FIR06-00159
| INSP-Final Inspection | 6/26/2006 | 6/28/2006 | 6/28/2006 2:11:57 PM | A | FAIL |
|
|
On site inspection approx. 2 hrs., inspected basement areas north and south and ground level area south. Correction items include PIV tamper, incorrect addressing at two in duct detectors, two restrooms with non-functional notification devices, changed EOL's, changed av location and type which will require as-built plans reflecting actual install as deviated from approved plans, security door at the main entry/exit is not installed at this time to enable testing of this point, provide list of signals recieved for verification at next inspection, per review comments NFPA record of inspection and testing to be completed by the contractor prior to request for final inspection.
|
FIR05-00713
| INSP-Sprinkler Rough-in/Hydro | 6/27/2006 | 6/28/2006 | 6/28/2006 11:43:53 AM | A | PART |
|
|
AG hydrostatic test completed.
|
BLD04-02808
| FIRE-Final Inspection | 6/27/2006 | 6/28/2006 | 6/28/2006 11:33:12 AM | A | PART |
|
|
Inspected units 9-17, smoke alarms are okay, need to provide portable fire extinguishers per requirements of IFC 2003 906.1 and per review comment #10.
|
FIR05-00631
| INSP-Final Inspection | 6/27/2006 | 6/28/2006 | 6/28/2006 10:31:57 AM | A | PASS |
|
|
Items on correction notice have been verified for completion, inspection passed, permit finaled.
|
FIR05-00048
| INSP-Final Inspection | 6/26/2006 | 6/28/2006 | 6/28/2006 8:26:16 AM | A | PASS |
|
|
Items on c/n have been verified for completion, fire alarm permit finaled. NOTE: record of completion forms not available on site for signature, contractor to provide today at next inspection.
|
FIR04-00166
| INSP-Final Inspection | 6/26/2006 | 6/28/2006 | 6/28/2006 8:23:33 AM | A | PASS |
|
|
Required corrections have been completed, fire alarm work is satisfactory, permit finaled.
|
FIR05-00854
| INSP-Final Inspection | 6/27/2006 | 6/28/2006 | 6/27/2006 11:13:50 AM | A | CANC |
|
|
Could we get this inspection around 9:30 am. James is the contact @###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|