Inspections for the day of: Wednesday, June 28, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00478 INSP-Final Inspection6/28/20066/28/20066/29/2006 9:24:22 AMPCANC
don ###-#### Project is not ready for inspection per phone call from contractor.
FIR06-00258 INSP-Alarm Testing6/27/20066/28/20066/28/2006 3:38:18 PMPPART
Inspection of alarm devices in phase two of the remodeled floor area are acceptable, still need to install one missing notification device in the west corridor as circled on plans and test phase 3 of the floor remodel when completed.
BLD06-00317 FIRE-Final Inspection6/27/20066/28/20066/28/2006 3:35:37 PMPPART
Partial inspection for phase 2 of the floor remodel is satisfactory.
FIR05-00330 INSP-Final Inspection6/28/20066/28/20066/28/2006 2:22:21 PMPPASS
Final inspection is satisfactory, record of completion forms not available at the time of inspection, contractor to provide at next meeting, permit finaled.
FIR06-00128 INSP-Final Inspection6/28/20066/28/20066/28/2006 2:15:35 PMPFAIL
PIV tamper is adjusted incorrectly, provide "911" sign at the outside bell, the automatic ball drip for the FDC will not function as installed, no other items inspected for final at this time.
FIR06-00159 INSP-Final Inspection6/26/20066/28/20066/28/2006 2:11:57 PMAFAIL
On site inspection approx. 2 hrs., inspected basement areas north and south and ground level area south. Correction items include PIV tamper, incorrect addressing at two in duct detectors, two restrooms with non-functional notification devices, changed EOL's, changed av location and type which will require as-built plans reflecting actual install as deviated from approved plans, security door at the main entry/exit is not installed at this time to enable testing of this point, provide list of signals recieved for verification at next inspection, per review comments NFPA record of inspection and testing to be completed by the contractor prior to request for final inspection.
FIR05-00713 INSP-Sprinkler Rough-in/Hydro6/27/20066/28/20066/28/2006 11:43:53 AMAPART
AG hydrostatic test completed.
BLD04-02808 FIRE-Final Inspection6/27/20066/28/20066/28/2006 11:33:12 AMAPART
Inspected units 9-17, smoke alarms are okay, need to provide portable fire extinguishers per requirements of IFC 2003 906.1 and per review comment #10.
FIR05-00631 INSP-Final Inspection6/27/20066/28/20066/28/2006 10:31:57 AMAPASS
Items on correction notice have been verified for completion, inspection passed, permit finaled.
FIR05-00048 INSP-Final Inspection6/26/20066/28/20066/28/2006 8:26:16 AMAPASS
Items on c/n have been verified for completion, fire alarm permit finaled. NOTE: record of completion forms not available on site for signature, contractor to provide today at next inspection.
FIR04-00166 INSP-Final Inspection6/26/20066/28/20066/28/2006 8:23:33 AMAPASS
Required corrections have been completed, fire alarm work is satisfactory, permit finaled.
FIR05-00854 INSP-Final Inspection6/27/20066/28/20066/27/2006 11:13:50 AMACANC
Could we get this inspection around 9:30 am. James is the contact @###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice