MEC06-01737
| Rough-in | 6/27/2006 | 6/28/2006 | 6/28/2006 5:29:28 PM | P | PEND |
|
|
Please inpsect as early as possible. Builder wanted a.m. but I wasn't sure we could be ready. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS..out of time..called april to reschedule for thurs am..i will make it my first stop..i called structural inspector and he will wait for me to call before he goes out..i called g/c at 3:50 but he didn't return my call..
|
MEC06-02142
| Pressure Test | 6/27/2006 | 6/28/2006 | 6/28/2006 5:26:35 PM | P | DONE |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS..no inspection needed on 4' of pipe
|
MEC06-02053
| Final | 6/27/2006 | 6/28/2006 | 6/28/2006 5:23:56 PM | A | FAIL |
|
|
Please call Glen before going out if no answer his cell # is ###-####. Thank you!! Veronica ; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt..termination to be 3' from w/h flue
|
MEC06-00702
| Final | 6/28/2006 | 6/28/2006 | 6/28/2006 4:18:35 PM | P | PASS |
|
|
nat; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
MEC06-00097
| Final | 6/28/2006 | 6/28/2006 | 6/28/2006 3:22:35 PM | P | PASS |
|
|
thomas- call 1/2 hr prior to insp so he can meet you there - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
MEC06-02091
| Rough-in | 6/27/2006 | 6/28/2006 | 6/28/2006 2:34:12 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 1:02:09 PM. Contact: ###-####...talked to g/c about passageway and working space in front of attic equipment..he will make those adjustments. we also discussed the tankless w/h..i told them it was per manufacturer..ok to cover main floor. owner is doing own hydronics.
|
MEC06-02076
| Rough-in | 6/28/2006 | 6/28/2006 | 6/28/2006 1:49:30 PM | A | PEND |
|
|
Scheduled by a contractor via Hello! on 6/28/2006 at 4:09:50 AM. Contact: ###-####...will do r/i when heating co. calls for theirs..thanks alot
|
MEC06-00215
| Final | 6/26/2006 | 6/28/2006 | 6/28/2006 11:54:13 AM | A | PASS |
|
|
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
MEC06-02131
| Rough-in | 6/27/2006 | 6/28/2006 | 6/28/2006 11:53:47 AM | A | PART |
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..100lb test on main floor ok
|
MEC06-01766
| Rough-in | 6/28/2006 | 6/28/2006 | 6/28/2006 11:44:01 AM | P | CANC |
|
|
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe Inspection cancelled from web by: Patti Forsythe
|
MEC06-01766
| Pressure Test | 6/28/2006 | 6/28/2006 | 6/28/2006 11:43:59 AM | P | CANC |
|
|
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe Inspection cancelled from web by: Patti Forsythe
|
MEC06-01765
| Rough-in | 6/28/2006 | 6/28/2006 | 6/28/2006 11:43:22 AM | P | CANC |
|
|
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe Inspection cancelled from web by: Patti Forsythe
|
MEC06-01765
| Pressure Test | 6/28/2006 | 6/28/2006 | 6/28/2006 11:43:17 AM | P | CANC |
|
|
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe Inspection cancelled from web by: Patti Forsythe
|