BLD06-01553
| BLD-Wall cover | 6/28/2006 | 6/28/2006 | 6/28/2006 5:30:39 PM | P | PASS |
|
|
Please call Paul to view the area to be inspected. Thanks.
|
BLD06-00317
| BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 5:30:19 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 2:48:05 PM. Contact: ###-####. ok to move into ph b
|
MIS06-00158
| BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 3:00:34 PM | P | PART |
|
|
MATT CILLEY ###-####///PLEASE CALL 30 MIN PRIOR TO MEET FOR ACCESS ok for temp occ ok for perm after fire gos perm
|
BLD05-02114
| BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 2:03:28 PM | A | PASS |
|
|
eric -call terry records before insp-reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley all c/n items completed at time of inspection
|
BLD05-02114
| DOC - Permit Finaled | 6/28/2006 | 6/28/2006 | 6/28/2006 2:02:46 PM | P | PASS |
|
|
|
BLD05-01077
| BLD-Wall cover | 6/27/2006 | 6/28/2006 | 6/28/2006 10:05:55 AM | A | PART |
|
|
Dave please see Paul for lobby Ceiling re-inspection. ok to cover hard lids in lobby and lobby restrooms after other trades have signed off
|
BLD04-02808
| BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 10:04:46 AM | A | NR |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs elec and fire life saftey finals
|
BLD06-00751
| BLD-Final | 6/27/2006 | 6/28/2006 | 6/28/2006 8:43:31 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 7:54:44 AM. Contact: ###-####.
|
BLD06-00751
| DOC - Permit Finaled | 6/28/2006 | 6/28/2006 | 6/28/2006 8:43:15 AM | P | PASS |
|
|
|