Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00799 FIR-Aging Inspection6/28/20066/28/20066/29/2006 11:54:07 AM NR
work is in progress
FIR05-00159 INSP-Final Inspection6/28/20066/28/20066/28/2006 4:10:58 PMPCANC
Scheduled by a contractor via Hello! on 6/28/2006 at 10:23:41 AM. Contact: ###-####.
FIR06-00433 INSP-Sprinkler Rough-in6/28/20066/28/20066/28/2006 2:58:07 PMPPART
Sprinkler piping in the tenant space is ok to cover but the additional upright heads on the shell/core side of the demizing wall still need installed.
BLD05-03256 FIRE-Final Inspection6/27/20066/28/20066/28/2006 1:44:11 PMAFAIL
Need to final the fire alarm permit. I went over life safety items with Don. Life safety can be finaled when fire alarm passes.
FIR06-00462 INSP-Sprinkler Rough-in6/27/20066/28/20066/28/2006 1:43:16 PMAPASS
The underground up to cap which is just passed the elbow is ok to cover.
MIS06-00158 FIR-Final6/27/20066/28/20066/28/2006 10:05:35 AMAPART
A temporary occupancy was given until the fire extinguishers get tagged, new address numbers are provided, provide automatic flush bolts and sticker at the main exit, provide approved hardware on the south exterior exit door and remove the large sliding deadbolt.
BLD05-02453 FIRE-Final Inspection6/27/20066/28/20066/28/2006 8:04:15 AMACANC