Inspections for the day of: Monday, June 28, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00278 INSP-Final Inspection6/24/20106/28/20106/28/2010 3:38:35 PMPPASS
Permit finaled
BLD10-01224 BLD-Final6/28/20106/28/20106/28/2010 3:37:58 PMPPASS
Life safety passed
BLD10-00608 FIRE-Final Inspection6/28/20106/28/20106/28/2010 1:52:07 PMPPASS
life safety passed
BLD10-00813 FIRE-Final Inspection6/23/20106/28/20106/28/2010 11:48:52 AMAPASS
The thumb turn lock that has been installed on the main entry/exit has been defurred to the building inspector. I notified debbie, at the vision office, of what needs to be done. I also notified Jim Sly about this follow up.
FIR10-00274 INSP-Final Inspection6/25/20106/28/20106/28/2010 11:21:14 AMAPASS
Permit finaled. This is the phase I portion of the project.