BLD11-02570
| BLD-Framing/Rough-in | 6/28/2012 | 6/28/2012 | 6/28/2012 3:32:13 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. Complete lateral bracing on B6, A1 and A2 trusses.Strap double top plate break at wall in garage. Provide additional nailing into king stud at the two 9.5 LVL at garage side. Block other side if 11.75 LVL above bottom of stairs. Provide city approved plans. Ok to insu;late. Correction notice posted.
|
BLD11-02300
| BLD-Final | 6/28/2012 | 6/28/2012 | 6/28/2012 3:29:36 PM | P | NR |
|
|
Rollo Phone #: ###-####. Needs mech. final.
|
BLD12-01212
| BLD-Framing/Rough-in | 6/28/2012 | 6/28/2012 | 6/28/2012 2:33:01 PM | P | PASS |
|
|
Garrett Phone #: ###-####. All issues have been resolved. ok for cover.
|
GCB12-00028
| GCB-Footing | 6/27/2012 | 6/28/2012 | 6/28/2012 1:33:36 PM | P | FAIL |
|
|
Robert @ ###-#### PM Inspection. Footing for compactor pad, Verts exceed the 16" O.C. spacing as shown on RFI and needs to provide 3" of clearance from bottom of footing to bottom of rebar. Correction notice was issued. MTI will verify repairs prior to placement and note on report.
|
BLD12-00297
| BLD-Energy code compliance | 6/27/2012 | 6/28/2012 | 6/28/2012 10:55:12 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD12-00297
| BLD-Framing/Rough-in | 6/28/2012 | 6/28/2012 | 6/28/2012 10:55:03 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall. All framing issues noted on correction notice have been resolved.
|
BLD12-00441
| BLD-Other | 6/27/2012 | 6/28/2012 | 6/28/2012 10:13:52 AM | A | PASS |
|
|
john Phone #: ###-####. ceiling grid ok.
|
GCB12-00076
| GCB-Framing | 6/27/2012 | 6/28/2012 | 6/28/2012 9:54:05 AM | A | PASS |
|
|
Dave @ ###-####. Footing inspection, front and rear.
|
BLD12-01433
| BLD-Final | 6/26/2012 | 6/28/2012 | 6/28/2012 9:14:42 AM | A | PASS |
|
|
Jim Phone #: ###-####
|
BLD12-01433
| DOC - Permit Finaled | 6/28/2012 | 6/28/2012 | 6/28/2012 9:14:13 AM | P | PASS |
|
|
|