BLD13-01030
| BLD-Energy code compliance | 6/27/2013 | 6/28/2013 | 6/28/2013 3:31:59 PM | P | PASS |
|
|
vedad Phone #: ###-####
|
BLD12-02334
| BLD-Conference | 6/28/2013 | 6/28/2013 | 6/28/2013 3:28:43 PM | P | DONE |
|
|
Nick Phone #: ###-####
|
BLD13-01640
| BLD-Final | 6/28/2013 | 6/28/2013 | 6/28/2013 3:27:40 PM | P | PEND |
|
|
Leon Phone #: ###-#### Re-sched.......
|
BLD13-01469
| BLD-Final | 6/26/2013 | 6/28/2013 | 6/28/2013 3:18:09 PM | A | CANC |
|
|
Chris ###-#### Re-sched.....
|
GCB13-00026
| GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 12:57:35 PM | A | CANC |
|
|
###-#### Josh All nailing for shear and 2hr. wall OK @ all concealed spaces at boxed pop outs.......Rear wall and Gar. fronts. Note:......Need retro fit HD's at Gar. front portal.
|
GCB13-00025
| GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 12:54:38 PM | A | PART |
|
|
Josh ###-#### All nailing for shear and 2hr wall OK at all concealed spaces @ boxed pop outs.....Rear wall and Gar. fronts. Note: ..Need retro fit HD's At Gar. front portal.
|
GCB13-00024
| GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 12:51:12 PM | A | PART |
|
|
Josh ###-#### All nailing for shear and 2hr. wall OK @ all concealed spaces of boxed pop outs......rear wall and Gar. fronts. Note: Need retro fit HD's @ garage front portal.
|
GCB13-00023
| GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 12:46:34 PM | A | PART |
|
|
Josh ###-#### All Nailing for shear and 2hr wall OK at all concealed spaces at all boxed pop outs....Rear and gar. fronts. Note: Need retro fit HD's @ Gar. front portal.
|
BLD13-01223
| BLD-Framing/Rough-in | 6/27/2013 | 6/28/2013 | 6/28/2013 12:38:35 PM | A | PASS |
|
|
after 10am//Bruce Phone #: ###-####
|