ESC13-00339
| Conference | 6/27/2013 | 6/28/2013 | 6/28/2013 12:02:11 PM | A | DONE |
|
|
Met with Troy (owner's rep) and John (RP rep) and reviewed approved ECP. Reviewed action items neccessary to complete Phase I which required stabilization of the swales with seed and jute matting and installation of perimeter controls to protect the completed swales. Will re-inspect Monday.
|
ESC13-00232
| BMP Violation | 6/25/2013 | 6/28/2013 | 6/28/2013 12:00:14 PM | A | PASS |
|
|
|
ESC13-00144
| General Inspection | 6/28/2013 | 6/28/2013 | 6/28/2013 12:00:00 AM | | FAIL |
|
|
Still needs stabilized. Owner submitted mix design for seed, mulch and tackifier for approval that includes pasture mix seed at 50 lb/ac, 1500 lb/ac wood fiber mulch and 10 lb/ac soil pam for the tackifier. Trying to verify SoilPam application rate with manufacturer. Specification sheet provided doesn't spec application rates for this type of application. See email correspondance. LM for project owner 6/28
|