BLD16-00275
| BLD-Framing/Rough-in | 6/28/2016 | 6/28/2016 | 6/28/2016 5:49:40 PM | P | NR |
|
|
Mike Phone #: ###-####
|
BLD16-02232
| BLD-Final | 6/28/2016 | 6/28/2016 | 6/28/2016 3:49:07 PM | P | PASS |
|
|
Dave-call for access Phone #: ###-#### OK for Perm Occ.
|
BLD16-00088
| BLD-Framing/Rough-in | 6/27/2016 | 6/28/2016 | 6/28/2016 3:15:22 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Paul Fedorchuk Correction Notice posted .....OK to insulate.
|
BLD16-02064
| BLD-Foundation | 6/28/2016 | 6/28/2016 | 6/28/2016 2:41:39 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-00480
| BLD-Framing/Rough-in | 6/28/2016 | 6/28/2016 | 6/28/2016 2:33:09 PM | P | PASS |
|
|
would like call ahead; Brandon Phone #: ###-####
|
BLD16-01370
| BLD-Wall Bracing | 6/28/2016 | 6/28/2016 | 6/28/2016 1:48:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD16-01264
| BLD-Final | 6/27/2016 | 6/28/2016 | 6/28/2016 11:34:00 AM | A | PASS |
|
|
Jered Phone #: ###-####
|
BLD16-01264
| DOC - Permit Finaled | 6/28/2016 | 6/28/2016 | 6/28/2016 11:33:48 AM | P | PASS |
|
|
|
BLD16-01307
| BLD-Foundation | 6/27/2016 | 6/28/2016 | 6/28/2016 11:01:01 AM | A | PASS |
|
|
Phone #: ###-####
|
MIS16-00194
| BLD-Conference | 6/27/2016 | 6/28/2016 | 6/28/2016 10:43:36 AM | A | DONE |
|
|
possible structural work being done without a permit Stop Work Order Issued. Roofing, Siding Painting, Interior Gut out........with plumbing, Mechanical and Electrical work going on. Reisch Constr. ###-####. Double Fee.
|
BLD16-01054
| BLD-Framing/Rough-in | 6/27/2016 | 6/28/2016 | 6/28/2016 10:10:50 AM | A | PASS |
|
|
Phone #: ###-#### Frame and Energy pass.
|
BLD16-02194
| BLD-Framing/Rough-in | 6/27/2016 | 6/28/2016 | 6/28/2016 9:54:50 AM | A | PASS |
|
|
friendly dogs; Micheal Phone #: ###-####
|
BLD16-02157
| BLD-Foundation | 6/27/2016 | 6/28/2016 | 6/28/2016 12:00:00 AM | A | CANC |
|
|
Bernie Phone #: ###-####
|