Inspections for the day of: Tuesday, June 28, 2016.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF16-00009 INSP-Final6/27/20166/28/20166/28/2016 4:42:52 PMAPEND
Fire Extinguisher needs current inspection and sign above doors (THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED).
Pending verification that the following is completed.
NAF14-00010 INSP-Final6/23/20166/28/20166/28/2016 3:58:23 PMAPART
Walk through completed. Flow switch was not wired so acceptance test was not completed. To be rescheduled once switch is wired.
NAF16-00009 INSP-Sprinkler Rough-in/Hydro6/27/20166/28/20166/28/2016 1:07:45 PMADONE
Inspection to verify tape was removed from sprinkler head as noted at Sprinkler Permit Final.
GCB15-00078 FIRE-Final Inspection6/27/20166/28/20166/28/2016 12:31:52 PMPPASS
Life Safety Pass.