Inspections for the day of: Wednesday, June 28, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01354 General Inspection6/28/20176/28/20176/30/2017 3:50:01 PMACANC
ESC17-00615 Complaint Inspection6/28/20176/28/20176/30/2017 12:01:26 PMPPASS
No trackout or sediment runoff from site. Trash contained, permit sign posted. Framing in progress.

Complaint actually about new project across street. Excess soil reportedly leveled out on adjacent lot. Will follow up.
ESC16-01233 General Inspection6/23/20176/28/20176/30/2017 11:00:51 AMAPASS
WIP. No trackout or discharges. Check for DI bags installed down access road after completion.
ESC16-00788 Site Final6/23/20176/28/20176/30/2017 10:38:52 AMPPASS
Home is complete, landscaped and occupied. DI bag installed down hill from site will be removed once adjacent house is complete. No further ESC inspections required.
ESC16-01228 General Inspection6/28/20176/28/20176/29/2017 9:22:00 AM PEND
Project complete and stabilized. Some minor work required for BLD final.

Request issued to IDS to remove temporary DI bag on Lusk that they installed. Disturbed area is now stabilized/landscaped. RP Seth agreed and said will remove. Site Final scheduled for next week.
ESC17-00122 Site Final6/28/20176/28/20176/28/2017 12:00:11 PMPPASS
Demo complete. New SFH covered under ESC17-00296. No ESC corrections needed at site.
ESC16-01729 General Inspection6/28/20176/28/20176/28/2017 11:50:56 AMAPASS
WIP on grading and site preparation. Permit sign posted on Beverly next to rock consturction entrance. No trackout, discharges, or fugitive dust occuring. No corrections requested.
ESC16-01365 Aging Inspection6/28/20176/28/20176/28/2017 11:49:44 AM CANC
rescheduled for site final
ESC16-01473 DOC - Permit Finaled6/28/20176/28/20176/28/2017 11:46:24 AMPPASS
ESC16-01178 Aging Inspection6/28/20176/28/20176/28/2017 11:41:20 AM CANC
rescheduled for site final.
ESC17-00316 General Inspection6/27/20176/28/20176/28/2017 11:32:28 AMAPASS
WIP on foundations. ESC site plan and permit on site for review. RP on duty.

Water truck available for dust control. No issues or complaints received.

Onsite storm drain at northwest corner is protected and will be replaced this weekend with new large facility. MS4 on Victory has DI bag installed.

Approved.
ESC16-01090 Aging Inspection6/28/20176/28/20176/28/2017 11:05:15 AM CANC
ESC16-01311 General Inspection6/28/20176/28/20176/28/2017 11:04:52 AM PASS
ESC17-00102 General Inspection6/27/20176/28/20176/28/2017 10:45:23 AMAPASS
No activity at site. Water truck on site for dust control. No dust complaints received. City of Boise ESC Permit sign posted. No trackout or discharges.

No eNOI for CGP 2017 listed or found. Will notify Granite construction.

ESC15-01369 DOC - Permit Finaled6/28/20176/28/20176/28/2017 9:28:57 AMPPASS