ELE17-02412
| ELE-Aging Inspection | 6/28/2019 | 6/28/2019 | 7/3/2019 1:01:25 PM | | PASS |
|
|
Please call with progress on project, or schedule a final inspection.
|
ELE19-00309
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 1:56:12 PM | P | PASS |
|
|
Please call Eva before you go. Eva needs to be there. +1 ###-#### Phone #: ###-#### Inspection requested via web by Greg Idsinga Ok final.
|
ELE19-02418
| Conference | 6/28/2019 | 6/28/2019 | 6/28/2019 1:25:42 PM | P | DONE |
|
|
Clarke Phone #: ###-#### Discussed service location and mast height for roofline.
|
ELE17-02286
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 12:42:31 PM | A | CANC |
|
|
Todd will call back in for final once homeowner pulls permit.
|
ELE19-01092
| Final | 6/28/2019 | 6/28/2019 | 6/28/2019 12:38:41 PM | P | PASS |
|
|
Garage code is 2452 Phone #: ###-#### Inspection requested via web by Kevin Heideman Ok final. 3/0 blank above mstr tub.
|
ELE19-01108
| Final | 6/28/2019 | 6/28/2019 | 6/28/2019 12:38:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Hilke Ok final. Island recept was installed under a roughly 15in overhang. Contractor blanked off and I had him move it to a code compliant location.
|
ELE19-01193
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 12:16:58 PM | P | PASS |
|
|
The unit will be unlocked ; is vacant Call Fred with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. All units with 20a 2 pole.
|
ELE19-02163
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 11:19:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting Ok final. All labeling present.
|
ELE19-02223
| Final | 6/28/2019 | 6/28/2019 | 6/28/2019 10:44:11 AM | A | PASS |
|
|
per Mark Ok final. Sub panel labeled, grds/nuet seperated.
|
ELE19-01190
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 10:40:46 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final.
|
ELE19-02118
| Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 10:11:49 AM | A | PASS |
|
|
finished removing knob and tube in attic, just need approval to cover with insulation Phone #: ###-#### Inspection requested via web by Troy Cobb Areas fished in. Jboxes set in attic and knob and tube removed. It will be insulated.
|
ELE19-01996
| Permanent Service | 6/27/2019 | 6/28/2019 | 6/28/2019 9:59:46 AM | A | PASS |
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg 2 grd rods, water bond. p/s o/h n ok
|
ELE19-02389
| Final | 6/27/2019 | 6/28/2019 | 6/28/2019 9:59:18 AM | A | PASS |
|
|
disconnect is around side of house, customer is out of town but gave permission to access yard- gate should be open/ unlocked Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON Ok final. 15a max fuse installed.
|
ELE19-02019
| Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 9:40:48 AM | A | PASS |
|
|
CONTACT: JASON NOBLE Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover kitchen. Knob and Tube issue addressed. Insulation was removed.
|
ELE19-01709
| Electrical Rough-In | 6/27/2019 | 6/28/2019 | 6/28/2019 9:03:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Monty Adkinson Ok cover main level and basement.
|
ELE19-02284
| Rough-In Permanent Service | 6/27/2019 | 6/28/2019 | 6/28/2019 9:03:08 AM | A | PASS |
|
|
this is a basement remodel. needs wall cover. need also a upgraded service inspection. the house is occupied, to inspect panel, you can disconnect the existing service 100 amp breaker. the general will be onsite. Phone #: ###-#### Inspection requested via web by Taras Shulga Ok cover basement. p/s u/g n ok
|
ELE19-02223
| Permanent Service | 6/28/2019 | 6/28/2019 | 6/28/2019 8:25:12 AM | A | PASS |
|
|
per Mark p/s o/h rec ok Already energized.
|
ELE19-02163
| Final | 6/27/2019 | 6/28/2019 | 6/27/2019 10:40:58 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by BRS Permitting Inspection cancelled from web by: BRS Permitting
|