Inspections for the day of: Friday, June 28, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM19-01951 Final6/27/20196/28/20196/28/2019 4:03:41 PMPPASS
Thank you! Phone #: ###-#### Inspection requested via web by KEVIN FRANKLIN
PLM19-02705 Water and/or Sewer6/28/20196/28/20196/28/2019 3:46:42 PMPPASS
Phone #: ###-#### Inspection requested via web by john brown
PLM19-02705 DOC - Permit Finaled6/28/20196/28/20196/28/2019 3:46:23 PMPPASS
3" cleanout inside garage. 1"' poly between buildings for pex sleeve.
PLM19-02673 Water Heater Final6/27/20196/28/20196/28/2019 11:15:37 AMAPASS
Phone #: ###-#### Inspection requested via web by Mary LaFayette
PLM19-02697 Water and/or Sewer6/27/20196/28/20196/28/2019 10:21:57 AMAPART
Phone #: ###-#### Inspection requested via web by Darren Wood
water ok to cover sewer nr
PLM19-02650 Water and/or Sewer6/25/20196/28/20196/28/2019 9:32:29 AMACANC
Phone #: ###-#### Inspection requested via web by James Pardy inspected under Water Heater final
PLM19-02650 Water Heater Final6/28/20196/28/20196/28/2019 9:32:04 AMAFAIL
Phone #: ###-#### Inspection requested via web by James Pardy.
Pipe the T&P off the platform.
Install a drain pan large enough to meet the mfg. instructions. 4" larger than the htr min.
PLM19-02703 Water and/or Sewer6/28/20196/28/20196/28/2019 9:12:21 AMAPART
Lines are installed in trenches, under air test, tracer wire installed. Hasib is leadman. Phone #: ###-#### Inspection requested via web by Scott Sparrell.
ok to cover all but meter connections. Seal basement wall and certify backflow
PLM19-02693 Water and/or Sewer6/27/20196/28/20196/28/2019 8:45:07 AMAPASS
Ready early am. Phone #: ###-#### Inspection requested via web by Jacob Wilcox
PLM19-02693 DOC - Permit Finaled6/28/20196/28/20196/28/2019 8:44:55 AMPPASS