BLD01-01720
| BLD-Foundation | 6/28/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | A | PART |
|
|
###-####; add hd straps at s.w. corner per plan 6/29/2001 10:30:17 AM
|
BLD00-03133
| BLD-Conference | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 6/29/2001 11:06:30 AM w/ ownerJim Cook; re occ. separation & install of foam insul...protect int of bldg w/ thermal barrier of 15 (gypsum or equal) 6/29/2001 11:15:18 AM
|
BLD01-01089
| BLD-Conference | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/29/2001 1:16:04 PM w/ bldr, ok to begin cover, keep c/n
|
BLD01-01090
| BLD-Conference | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/29/2001 1:16:40 PM w/ bldr, ok to begin cover
|
BLD01-01349
| BLD-Conference | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 6/29/2001 2:18:00 PM w/ owner & contractor....need fire ok prior to struct. ok
|
MEC01-01881
| Pressure Test | 6/28/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/28/2001 at 18:18:02. Contact: ###-####.
|
BLD01-00836
| BLD-Framing/Rough-in | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | NR |
|
|
shear wall reinspection Troy ###-####; gave to 420 6/29/2001 2:16:43 PM
|
BLD01-01604
| BLD-Foundation | 6/29/2001 | 6/29/2001 | 6/29/2001 12:00:00 AM | P | NR |
|
|
for the garage... JR ###-####; unable to locate plans 6/29/2001 3:21:53 PM
|