Inspections for the day of: Friday, June 29, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01250 BLD-Energy code compliance6/28/20016/29/20016/29/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/28/2001 at 12:47:16. Contact: ###-####. all items on c/n have been corrected ok to cover 6/29/2001 10:36:59 AM
BLD01-00878 BLD-Framing/Rough-in6/28/20016/29/20016/29/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/28/2001 at 19:10:23. Contact: ###-####. c/n items have been correced insulation ok ok to cover 6/29/2001 10:49:03 AM
BLD01-01574 BLD-Footing6/28/20016/29/20016/29/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/28/2001 at 22:38:00. Contact: ###-####.work in progress checked set backs all look ok 6/29/2001 10:27:02 AM
BLD01-01384 BLD-Framing/Rough-in6/29/20016/29/20016/29/2001 12:00:00 AMPPASS
fr-- dick ###-#### ph #1 ok to cover walls 6/29/2001 1:36:04 PM
BLD00-02851 BLD-Framing/Rough-in6/29/20016/29/20016/29/2001 12:00:00 AMPNR
Julie or Tanya ###-####
MEC01-01922 Final6/29/20016/29/20016/29/2001 12:00:00 AMPPASS
pressure test Debbie ###-####
BLD01-00144 BLD-Framing/Rough-in6/27/20016/29/20016/29/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/27/2001 at 10:54:18. Contact: ###-####. roof sheating and framing 6/29/2001 1:05:08 PM
BLD01-01251 BLD-Framing/Rough-in6/28/20016/29/20016/29/2001 12:00:00 AMPFAIL
Eric ###-#### c/n on site not ok to inslate 6/29/2001 3:26:44 PM