Inspections for the day of: Tuesday, June 29, 2004.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRon Ginner
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-03820 Final6/28/20046/29/20046/29/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/28/2004 at 11:45:19 AM. Contact: ###-####.
PLM04-01209 Final6/28/20046/29/20046/29/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/28/2004 at 1:51:52 PM. Contact: ###-####.
PLM04-01787 Sprinkler (Final)6/28/20046/29/20046/29/2004 12:00:00 AMAPASS
antontio - ###-####
PLM04-01796 Plumbing Rough-in6/29/20046/29/20046/29/2004 12:00:00 AMPPASS
Robert ###-#### inspected outside water line, sleeved in sch 40 pvc and feeds an outside yard hydrant. to be tested with a gage after backfill 6/29/2004 1:10:03 PM
PLM04-01192 Plumbing Rough-in6/29/20046/29/20046/29/2004 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel