Inspections for the day of: Thursday, June 29, 2006.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-02140 Rough-in6/28/20066/29/20066/29/2006 5:01:10 PMAPART
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..GAS OK..R/I FAILED..NEED 1" CLEARANCE FROM B-VENT TO ROOF..TAPE JOINTS ON R/A AND SUPPLY IN CHASE WITH B-VENT..WRAP PINK BATTING WITH TAPE OR PANDUIT AND INSULATE METAL IN ATTIC.
MEC06-02142 Final6/29/20066/29/20066/29/2006 4:47:57 PMPPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-02016 Rough-in6/29/20066/29/20066/29/2006 4:47:31 PMPPEND
Please do gas pressure witness test with mechanical rough in. Please inspect outdoor fireplace rough in. Note: we did not install indoor fireplace, we only installed the outdoor fireplace. Thank You!; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis..OUT OF TIME..PLEASE RESCHEDULE FOR FRI AM...THANKS
MEC06-01471 Rough-in6/29/20066/29/20066/29/2006 3:33:06 PMAPASS
dick ###-####
MEC06-02173 Rough-in6/29/20066/29/20066/29/2006 3:02:44 PMPPASS
Internet Inspection Request from: Shelley Baisch
MEC06-01766 Pressure Test6/28/20066/29/20066/29/2006 2:34:59 PMPNR
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe
MEC06-01766 Rough-in6/28/20066/29/20066/29/2006 2:31:50 PMPNR
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe
MEC06-01765 Pressure Test6/28/20066/29/20066/29/2006 2:31:31 PMPNR
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe
MEC06-01765 Rough-in6/28/20066/29/20066/29/2006 2:30:59 PMPNR
re-inspection; Phone #: ###-#### x202 Internet Inspection Request from: Patti Forsythe
MEC06-01135 Final6/29/20066/29/20066/29/2006 1:50:47 PMANR
Scheduled by a contractor via Hello! on 6/29/2006 at 6:27:09 AM. Contact: ###-####...mark will reschedule for fri am
MEC05-04038 Rough-in6/29/20066/29/20066/29/2006 1:49:50 PMANR
Scheduled by a contractor via Hello! on 6/29/2006 at 6:25:37 AM. Contact: ###-####...mark will reschedule for fri am
MEC05-04035 Rough-in6/27/20066/29/20066/29/2006 1:49:10 PMANR
On site Corry @ ###-####; J571; Phone #: ###-#### Internet Inspection Request from: Dixie Miyake..corry will reschedule for fri am..i will meet him at 9:00
MEC06-01634 Final6/27/20066/29/20066/29/2006 1:05:55 PMAFAIL
christine; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..need outside combustion air..called paul
MEC06-02158 Final6/29/20066/29/20066/29/2006 12:20:28 PMPPASS
joe
MEC06-02158 Pressure Test6/28/20066/29/20066/29/2006 12:20:05 PMAPASS
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...60lb ok
MEC06-02017 Rough-in6/29/20066/29/20066/29/2006 10:42:06 AMPCANC
Please do gas pressure witness test with mechanical rough in.; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis Inspection cancelled from web by: Donnette Ellis
MEC06-01998 Rough-in6/28/20066/29/20066/28/2006 5:02:22 PMACANC
jim Note: for layout and pictures prior to pour; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Jim Ritter