Inspections for the day of: Thursday, June 29, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00218 INSP-Supply line flush6/28/20066/29/20066/29/2006 6:46:17 PMPPASS
underground supply line flushed passed
FIR06-00429 INSP-Final Inspection6/28/20066/29/20066/29/2006 6:45:22 PMPPASS
permit finaled
FIR05-00536 INSP-Supply line flush6/29/20066/29/20066/29/2006 3:56:43 PMPPART
Inspection was not for a flush but for a partial cover inspection of the underground. One length of underground piping as installed is ok to cover. It extends from the existing tap to the base of the column.
FIR06-00078 INSP-Supply line flush6/29/20066/29/20066/29/2006 3:39:11 PMPPASS
Supply line flush passed.
FIR06-00478 INSP-Final Inspection6/29/20066/29/20066/29/2006 3:38:13 PMPPASS
Hood suppression system passed.
BLD05-03243 FIRE-Conference6/28/20066/29/20066/29/2006 11:25:02 AMADONE
Vern requested occupying the building with the first tenant while finish construction was taking place in the second tenant space. Per Dave Hanniman and I this will be ok as long as the fire sprinklers, fire alarm and fire life safety is complete for the shell and the tenant space that is going to be occupied.
FIR05-00159 INSP-Final Inspection6/29/20066/29/20066/29/2006 10:31:10 AMPFAIL
Forward flush passed. Need to address combustibles in the attic space above the west long corridor, above ground hydro test and the upright heads that are spaced too close at the peak