Inspections for the day of: Thursday, June 29, 2006.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-02160 Final6/28/20066/29/20066/30/2006 8:06:05 AMAPASS
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
MEC06-02159 Final6/28/20066/29/20066/30/2006 8:05:56 AMAPASS
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
MEC06-02170 Final6/29/20066/29/20066/29/2006 4:06:51 PMPPASS
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
MEC06-01425 Final6/29/20066/29/20066/29/2006 3:40:20 PMPPASS
MEC06-02172 Rough-in6/29/20066/29/20066/29/2006 3:38:56 PMPPASS
Internet Inspection Request from: Shelley Baisch
MEC06-02161 Final6/28/20066/29/20066/29/2006 3:38:37 PMPPASS
WE VENTED AND TIED IN TWO BATH FANS. THIS IS ALL THE WORK WE WILL BE DOING OUT HERE. THANKS, APRIL. Internet Inspection Request from: APRIL THOMAS
MEC06-01303 Final6/29/20066/29/20066/29/2006 2:56:40 PMPFAIL
rich; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
c/n posted, ok temp occ for training only
MEC06-01871 Rough-in6/29/20066/29/20066/29/2006 2:42:45 PMPFAIL
south side had issue with attic or crawl access, that should be taken care of. thanks, april; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
need clear access to furnace from attic access, and need switch for light at attic access
MEC06-01847 Pressure Test6/29/20066/29/20066/29/2006 1:36:11 PMPPASS
MEC06-01845 Pressure Test6/29/20066/29/20066/29/2006 1:35:49 PMPPASS
MEC06-01847 Rough-in6/29/20066/29/20066/29/2006 1:35:20 PMPFAIL
Please do gas pressure witness test with mechanical rough in reinspection. Thank You!; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis
light switch needs to be relocated to new attic access and still need 1" clearance to b-vent from line set
MEC06-01845 Rough-in6/29/20066/29/20066/29/2006 1:34:10 PMPFAIL
Please do gas pressure witness test with mechanical rough in reinspection. Thank You!; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis
light switch needs to be relocated to new attic access
MEC06-01737 Rough-in6/28/20066/29/20066/29/2006 12:55:05 PMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-02151 Rough-in6/28/20066/29/20066/29/2006 10:37:33 AMAFAIL
###-#### shelly
see c/n posted at 2268
MEC06-02022 Rough-in6/29/20066/29/20066/29/2006 10:37:04 AMAPASS
check w/h flue at final
MEC06-00975 Final6/28/20066/29/20066/29/2006 9:39:52 AMAPASS
Phone #: ###-#### x222 Internet Inspection Request from: Rhiannon Stuck
MEC06-01632 Final6/28/20066/29/20066/29/2006 8:49:17 AMAPASS
Scheduled by a contractor via Hello! on 6/28/2006 at 8:14:12 AM. Contact: ###-####.